March 1, 2017, Production & Analysis Working Group

From GlueXWiki
Revision as of 17:42, 17 February 2017 by Pmatt (Talk | contribs) (Reconstruction & Analysis Studies Status)

Jump to: navigation, search

Meeting Time and Place

The meeting will be on Wednesday March 1, 2017 at 2:00 pm EDT. For those people at Jefferson Lab, the meeting will be in room F326-327.

Meeting Connections

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/115815824.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 115815824.
  3. To join via phone, use one of the following numbers and the Conference ID: 115815824.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Reconstruction & Analysis Studies Status

Agenda

  • Announcements

Standing Items

  1. Monitoring Update (10 + 5) --- Thomas Britton
  2. Calibration Update (15 + 5) --- Sean Dobbs
  3. Data Production Update (5 + 5) --- Alex Austregesilo

This Week's Studies: Tracking/Shower Efficiencies

  • Updates on experiment, simulation, and the comparison between the two.
  • Summary/overviews only. Detailed discussions should be held in the appropriate working groups.
  1. CDC Hit Efficiencies (5 + 5)
  2. FDC Hit Efficiencies (5 + 5)
  3. Tracking Efficiencies (10 + 5)
  4. BCAL Hit Efficiencies (10 + 5)
  5. BCAL Shower Efficiencies (10 + 5)
  6. FCAL Hit Efficiencies (10 + 5)
  7. FCAL Shower Efficiencies (10 + 5)

Other

  1. AOB

Upcoming Schedule

  • Updates on experiment, simulation, and the comparison between the two.
  • Summary/overviews only. Detailed discussions should be held in the appropriate working groups.
  • All topics should be limited to 10 + 5 minute talks.
  • Next Week: Beamline & Triggering
    • Flux
    • Beam energy
    • Polarization (TPOL & lineshape)
    • Trigger emulation
    • Triggering efficiency
  • Week after next: Alignment & Channel-Analysis Studies
    • Drift chamber alignment
    • Branching ratios
    • Production ratios
    • Cross sections
    • SDMEs
  • The following week: Other (Any of below if update ready)
    • Efficiencies: TOF, SC
    • Means & Resolutions (time, ennergy, dE/dx): Tracking, BCAL, FCAL, SC, TOF
    • Uncertainties: PID (BCAL, FCAL, TOF), Kinfit (BCAL, FCAL, tracking)