March 1, 2017, Production & Analysis Working Group

From GlueXWiki
Revision as of 19:21, 19 February 2017 by Pmatt (Talk | contribs)

Jump to: navigation, search

Meeting Time and Place

The meeting will be on Wednesday March 1, 2017 at 2:00 pm EDT. For those people at Jefferson Lab, the meeting will be in room F326-327.

Meeting Connections

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/115815824.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 115815824.
  3. To join via phone, use one of the following numbers and the Conference ID: 115815824.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Reconstruction & Analysis Studies Status

Agenda

  • Announcements
  • Data Production
  • Analysis Focus: Total Cross Sections
  • This Week's Studies
  • Upcoming Schedule
  • AOB

Analysis Focus: Total Cross Sections

  • All talks should be limited to 15 + 5 minutes
  • J/Ψ --- Lubomir
  • η, ρ, ω, φ --- Simon

Data Production

  • Summary/overviews only. Detailed discussions should be held in the appropriate working groups.
  • All talks should be limited to 10 + 5 minutes
  1. Monitoring Update --- Thomas Britton
  2. Calibration Update --- Sean Dobbs
  3. Processing Update --- Alex Austregesilo

This Week's Studies: Hit Efficiencies

  • Updates on experiment, simulation, and the comparison between the two.
  • Summary/overviews only. Detailed discussions should be held in the appropriate working groups.
  • All talks should be limited to 10 + 5 minutes.
  1. CDC Hit Efficiencies
  2. FDC Hit Efficiencies
  3. BCAL Hit Efficiencies
  4. FCAL Hit Efficiencies

Upcoming Schedule

  • Updates on experiment, simulation, and the comparison between the two.
  • Summary/overviews only. Detailed discussions should be held in the appropriate working groups.
  • All talks should be limited to 10 + 5 minutes.
  • Next Week: Beamline & Triggering
    • Flux
    • Beam energy
    • Polarization (TPOL & lineshape)
    • Trigger emulation
    • Triggering efficiency
  • Week after next: Alignment & Track/Shower Efficiencies
    • Drift chamber alignment
    • Tracking Efficiencies
    • BCAL Shower Efficiencies
    • FCAL Shower Efficiencies
  • The following week: Other (Any of below if update ready)
    • Efficiencies: TOF, SC
    • Means & Resolutions (time, energy, dE/dx): Tracking, BCAL, FCAL, SC, TOF
    • Uncertainties: PID (BCAL, FCAL, TOF), Kinfit (BCAL, FCAL, tracking)
    • Channel/Analysis Studies: Branching ratios, cross sections, SDMEs, beam asymmetries
    • Other reconstruction/analysis issues