Difference between revisions of "March 15, 2013 Installation"

From GlueXWiki
Jump to: navigation, search
(Created page with "__TOC__ == Meeting Time and Place == Friday, March 15, 2013 at 1:30 PM At Jefferson Lab, the meeting will be held in F326 == Connections == To connect from the outside, please...")
 
(Agenda)
Line 28: Line 28:
  
 
# Announcements
 
# Announcements
# Updates to the Mechanical Installation Schedule (Tim)
+
# Updates to the Mechanical Installation Schedule ([[Media:Mar 2013 Install Schedule.pdf | Latest Rendition of Install Schedule]]) (Tim)
 
# Electronics Installation Schedule (Fernando)
 
# Electronics Installation Schedule (Fernando)
 
# Magnet Mapping (Tim)
 
# Magnet Mapping (Tim)

Revision as of 11:04, 15 March 2013

Meeting Time and Place

Friday, March 15, 2013 at 1:30 PM At Jefferson Lab, the meeting will be held in F326

Connections

To connect from the outside, please use ESNET

  1. ) ESNET: 8542553
  2. )To connect by telephone (supported on request only) dial:
  • You can look up toll-free number at http://www.readytalk.com/intl
  • US and Canada: (866)740-1260 (toll free)
  • International: (303)248-0285 (toll call)
  • enter access code followed by the # sign: 3421244#


Up to GlueX/Hall-D Installation Meetings

Action Items From Last Meeting

  • FDC and CDC will discuss installation details (Lubomir, Curtis, and Naomi)
  • Tim will organize solenoid mapping meeting
  • Matt and Elton will iterate on FCAL schedule
  • Sascha will produce a Wiki page documenting various commissioning trigger configurations
  • Matt will contact Fernando so that he can present the electronics schedule at the next meeting (March 15)

Agenda

  1. Announcements
  2. Updates to the Mechanical Installation Schedule ( Latest Rendition of Install Schedule) (Tim)
  3. Electronics Installation Schedule (Fernando)
  4. Magnet Mapping (Tim)
  5. CDC and FDC Installation Integration (Curtis, Lubomir, Naomi)
  6. FCAL Installation (Matt)
  7. A.O.B.

Minutes