March 15, 2017, Production & Analysis Working Group

From GlueXWiki
Revision as of 17:19, 15 March 2017 by Sdobbs (Talk | contribs) (Upcoming Study Schedule)

Jump to: navigation, search

Meeting Time and Place

The meeting will be on Wednesday March 15, 2017 at 2:15 pm EDT. For those people at Jefferson Lab, the meeting will be in room F326-327.

Meeting Connections

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/115815824.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 115815824.
  3. To join via phone, use one of the following numbers and the Conference ID: 115815824.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Reconstruction & Analysis Studies Status

Agenda

  1. Announcements
  2. Data Production
  3. Analysis Focus
  4. This Week's Studies
  5. Any other studies
  6. Upcoming Study Schedule

This Week's Topics

  • Talks: Summary/overviews only. Detailed discussions should be held in the appropriate working groups.
  • Talks should be limited to 10 + 5 minutes.

Data Production

  1. Monitoring Update --- Thomas Britton
  2. Calibration Update --- Sean Dobbs
  3. Preparing for the first Spring 2017 production launch --- Sean Dobbs, Paul Mattione
  4. Processing Update --- Alex Austregesilo

Analysis Focus: Total Cross Sections

  1. J/Ψ, φ update Lubomir
  2. η, ρ, ω, φ First look at cross sections from Spring 2017 run--- Simon
  3. φ --- Thomas
  4. Any others?

Studies: Alignment & Track/Shower Efficiencies

(i.e. Is the reconstruction working?) Updates on experiment, simulation, and the comparison between the two.

  1. Drift chamber alignment --- Mike Staib
  2. Tracking Efficiencies (Link) --- Paul Mattione
  3. BCAL Shower Efficiencies (Link) --- Elton Smith
  4. FCAL Shower Efficiencies --- Jon Zarling

Upcoming Study Schedule

  • Updates on experiment, simulation, and the comparison between the two.
  • Summary/overviews only. Detailed discussions should be held in the appropriate working groups.
  • All talks should be limited to 10 + 5 minutes.
  • Next Week: Other (Any of below if update ready)
  1. Track / Hit Matching: BCAL, FCAL, TOF, SC
  2. Efficiencies: TOF, SC
  3. Means & Resolutions (time, energy, dE/dx): Tracking, BCAL, FCAL, SC, TOF
  4. Uncertainties: PID (BCAL, FCAL, TOF), Kinfit (BCAL, FCAL, tracking)
  5. Channel/Analysis Studies: Branching ratios, cross sections, SDMEs, beam asymmetries
  6. Other reconstruction/analysis issues
  • Week after next: Beamline & Triggering
  1. Flux --- Justin
  2. Beam energy --- Beamline Group
  3. Polarization (TPOL & lineshape) --- Beamline Group
  4. Trigger emulation --- Alex Somov
  5. Triggering efficiency --- Alex Somov
  • The following week: Hit Efficiencies (i.e. Is the detector working?)
  1. CDC Hit Efficiencies --- Naomi Jarvis
  2. FDC Hit Efficiencies --- Alex Austregesilo
  3. BCAL Hit Efficiencies --- Elton Smith
  4. FCAL Hit Efficiencies --- Jon Zarling

Minutes

Announcements

  • The meeting time from now on is moving to 2 PM.

Data Production

  1. Sean gave a report on the status of calibrations from the run that just ended. Timing calibrations in process, and an "acceptable" version should be ready by Monday. He will send out an annoucement email. Expect unexplained changes and inconsistent results until then. 2/3 of the data is skimmed, and the jobs for the last 1/3 have been launched. Calibration skims and skims of all non-physics trigger types are being created. Higher-level calibrations are underway. Please see his slides and checklist for more details. Several tasks could use more hands, and Sean will organize this.
  2. Paul talked about preparations for the first production launch. This included:
    • We need to determine the different parts of the runs with consistent conditions.
    • A first pass at what the "good production" runs are has been done. Sean pointed out that more culling will come out of calibration activities, but we should also consider how to categorize runs used for special conditions, e.g. the "low-rate runs" used for efficiency studies.
    • Weekly monitoring launches are planned.
    • Rough estimates for beginning of production and the length that this may take are starting at the beginning of May and taking 6 weeks. We agreed in principle to separate production for the low and high rate running. Sean will set milestones and circulate them.
    • Matt Shepherd suggested creating "reduced" REST skims that are more likely to contain "interesting" events. Various potential definitions were discussed.

Analysis Focus: Total Cross Sections

  1. Lubomir presented some slides indicating that a fiducial cut rejecting small angle tracks substantially reduced the background in the J/psi region.
    • It appears as though this background is due to potentially in-time electromagnetic background events which are reconstructed in the FDC. Several suggestions were made, like looking at tracking chi^2 and the timing of matched hits in the start counter and TOF.
  2. Simon showed some preliminary rho and omega cross sections and their ratios from the Spring 2017 data. He used the REST files form the latest monitoring launch. The results are all over the place, but the calibrations are very preliminary, so the results should not be taken too seriously.
    • He plans to check his flux calculation with Justin's
  3. Thomas is looking at the phi cross section, his DSelector code is working now and producing results. He has also updated his MC wrappers and is trying to use hdgeant4 to extract these cross sections.

Studies: Alignment & Track/Shower Efficiencies

(i.e. Is the reconstruction working?) Updates on experiment, simulation, and the comparison between the two.

  1. Drift chamber alignment --- Mike Staib
  2. Tracking Efficiencies (Link) --- Paul Mattione
  3. BCAL Shower Efficiencies (Link) --- Elton Smith
  4. FCAL Shower Efficiencies --- Jon Zarling