Difference between revisions of "March 15, 2018 DIRC Optical Box"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
Line 28: Line 28:
 
#* [https://halldweb.jlab.org/wiki/images/a/aa/20180220_GlueX_Assembly_Sequence.pdf Plans for assembly and testing at Bates and in Hall D]
 
#* [https://halldweb.jlab.org/wiki/images/a/aa/20180220_GlueX_Assembly_Sequence.pdf Plans for assembly and testing at Bates and in Hall D]
 
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3521 Optical Box Alignment strawman] (Tim)
 
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3521 Optical Box Alignment strawman] (Tim)
#* [https://halldweb.jlab.org/wiki/images/a/aa/GlueX_Laser_Alignment.pdf Laser Alignment fixture]
+
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3578 Laser Alignment fixture] (Tim)
 
# AOB
 
# AOB

Latest revision as of 15:41, 28 March 2018

Meeting Information

GlueX DIRC Optical Box Meeting
Thursday March 15, 2018
10:00 am, EDT
JLab A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Optical box status
    • Status update (Ernie and Jason)
      • Box production at Lesker: final production drawing
      • PMT test fixture
        • Assembly procedure and discussion
      • Window quotes
      • Other items and quotes
  2. Installation with bar box discussion
  3. Discussion of assembly procedure
  4. AOB