Difference between revisions of "March 2, 2020 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 18: Line 18:
 
# Announcements:
 
# Announcements:
 
# Issues with the ongoing run:
 
# Issues with the ongoing run:
#* DIRC South Lower Box LV Group 9 trip during Start/Stop Run
+
#* DIRC South Lower Box LV Group 9 trip during Start/Stop Run. [https://logbooks.jlab.org/entry/3792443 Voltage at run start/stop] [https://logbooks.jlab.org/entry/3792445 Long Term Trend] [https://logbooks.jlab.org/entry/3794036 Fix]
#* Tile temperature/communication error: three time per week
+
#* Tile temperature/communication error: three time per week. https://logbooks.jlab.org/entry/3795747
 
#* DIRC water sample collection early March, then water quality monitoring
 
#* DIRC water sample collection early March, then water quality monitoring
 
#* Summer to-do list
 
#* Summer to-do list

Revision as of 12:52, 2 March 2020

Meeting Information

GlueX DIRC Meeting
Monday March 2, 2020
1:00 pm, EDT
CC A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements:
  2. Issues with the ongoing run:
  3. 2019 commissioning analyses
  4. High level observables: for run-by-run comparisons and bar/x position binning over DIRC plane (All)
    • Photon yield: reflected, direct, total
    • θC resolution: single-photon resolution, per-track resolution (from histogram fits)
    • Timing resolution: reflected, direct
    • FastDIRC: ΔX and ΔY resolution
  5. AOB