Difference between revisions of "March 2, 2020 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 44: Line 44:
 
#* <strike> FastDIRC: &Delta;X and &Delta;Y resolution </strike>
 
#* <strike> FastDIRC: &Delta;X and &Delta;Y resolution </strike>
 
# AOB
 
# AOB
#* Temporary: [https://halldweb.jlab.org/wiki/index.php/File:Gluex_dirc_temp.png]
+
#* Temporary GlueX PAckage with DIRC: [https://halldweb.jlab.org/wiki/index.php/File:Gluex_dirc_temp.png]
 +
#* An official GlueX Package with DIRC will come soon. [https://halldweb.jlab.org/wiki/index.php/File:Gluex_dirc_official.jpeg]

Revision as of 14:35, 2 March 2020

Meeting Information

GlueX DIRC Meeting
Monday March 2, 2020
1:00 pm, EDT
CC A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements:
  2. Issues and monitoring with the ongoing run:
    • LED trigger monitoring: [2]
      • Per pion/kaon track photon yield monitoring will be available soon.
      • Many items in item #4 can be monitored using the same platform.
    • DIRC South Lower Box LV Group 9 trip during Start/Stop Run.
    • Tile temperature/communication error: three time per week. [3]
      • Closely monitored. Would this lead to the 10G network card error? See [4] [5]
    • DIRC water sample collection early March, then water quality monitoring
    • Summer to-do list
  3. 2019 commissioning analyses
  4. High level observables: for run-by-run comparisons and bar/x-position binning over DIRC plane (All)
  5. AOB
    • Temporary GlueX PAckage with DIRC: [6]
    • An official GlueX Package with DIRC will come soon. [7]