Difference between revisions of "March 25, 2011 Fab Meeting"
From GlueXWiki
(→Discussions) |
(→Open Action Items) |
||
Line 27: | Line 27: | ||
* Block up existing BCAL boxes | * Block up existing BCAL boxes | ||
* Move coils 1 and 4 to Hall D | * Move coils 1 and 4 to Hall D | ||
− | * Test flow switch in Mag field - Scot </strike> | + | * <strike>Test flow switch in Mag field - Scot </strike> |
* Tom to work with Jim F. for BCAL readout prototyoe | * Tom to work with Jim F. for BCAL readout prototyoe | ||
* Order remaining controls items for the remaining coils - Scot | * Order remaining controls items for the remaining coils - Scot |
Revision as of 08:53, 25 March 2011
Meeting Time and Place
Friday March 25, 2011 at 8:15am At Jefferson Lab, the meeting will be held in room ARC 231
Agenda
- ESH&Q minute - Clean and recycle
- Announcements - Budget
- training - ensure up to date
- Manpower
- Solenoid Test Status *
- FDC construction update
- Upcoming work
- FDC practice foils, motion stage, Readiness review, lights
- BCAL Wedges
- Solenoid 3
- Solenoid 2
- Permanent magnets
- Collimator cave - install stands
- Platform - install this summer
Open Action Items
- Permanent Magnet chambers reworked/leak check chambers
- Remove vacuum chamber and build/install new
- Need to make sure access to BCAL wedges in ESB (Tom)
- Block up existing BCAL boxes
- Move coils 1 and 4 to Hall D
-
Test flow switch in Mag field - Scot - Tom to work with Jim F. for BCAL readout prototyoe
- Order remaining controls items for the remaining coils - Scot
New Action Items
Discussions
- In attendance C. Heck, D. Butler, A. Johnson, T. Carstens, Tim Whitlatch, S. Speigel, D. Boyles, G. Humble, M. Beizer, B. Bunton, T. Mann, M. Stevens,
- coil 3 in place - need to hi-pot
- FDC readiness review Thursday
- good saMPLES FOR UNIDIRECTIONAL CONDUCTIVE TAPE- RIGID FLEX TO CATHODE
- MANY PROCEDURES WRITTEN
- April 13 DIS tour - no work in Halld - Need BCAL wedge and solenoid coil