Difference between revisions of "March 25, 2011 Fab Meeting"

From GlueXWiki
Jump to: navigation, search
 
(Discussions)
 
(8 intermediate revisions by the same user not shown)
Line 5: Line 5:
  
 
== Agenda ==
 
== Agenda ==
* ESH&Q minute - Tornado
+
* ESH&Q minute - Clean and recycle
 
* Announcements - Budget  
 
* Announcements - Budget  
 
**  training - ensure up to date
 
**  training - ensure up to date
Line 12: Line 12:
 
* FDC construction update
 
* FDC construction update
 
* Upcoming work
 
* Upcoming work
** FDC practice foils, motion stage, Readiness review, lights
+
** <strike>FDC practice foils, motion stage, Readiness review, lights </strike>
 
** BCAL Wedges
 
** BCAL Wedges
 
** Solenoid 3
 
** Solenoid 3
Line 27: Line 27:
 
* Block up existing BCAL boxes
 
* Block up existing BCAL boxes
 
* Move coils 1 and 4 to Hall D
 
* Move coils 1 and 4 to Hall D
* Test flow switch in Mag field - Scot
+
* <strike>Test flow switch in Mag field - Scot </strike>
 
* Tom to work with Jim F. for BCAL readout prototyoe
 
* Tom to work with Jim F. for BCAL readout prototyoe
 
* Order remaining controls items for the remaining coils - Scot
 
* Order remaining controls items for the remaining coils - Scot
  
 
== New Action Items==
 
== New Action Items==
 +
* Hi-pot coil 2 and leak check and insulation
  
 
==Discussions==
 
==Discussions==
  
**In attendance  C. Heck, D. Butler,  A. Johnson,  T. Carstens,  Tim Whitlatch, S. Speigel, D. Boyles, G. Humble, M. Beizer, B. Bunton, T. Mann, M. Stevens,
+
**In attendance  C. Heck, D. Butler,  A. Johnson,  T. Carstens,  Tim Whitlatch, S. Speigel, S. Ellis G. Humble, M. Beizer, B. Bunton, T. Mann, M. Stevens,
 +
 
 +
* coil 3 in place - need to hi-pot
 +
* FDC readiness review Thursday
 +
* good saMPLES FOR UNIDIRECTIONAL CONDUCTIVE TAPE- RIGID FLEX TO CATHODE
 +
* MANY PROCEDURES WRITTEN
 +
* April 13 DIS tour - no work in Halld - Need BCAL wedge and solenoid coil
 +
* LCW flow switch trips at 5G field

Latest revision as of 09:04, 25 March 2011

Meeting Time and Place

Friday March 25, 2011 at 8:15am At Jefferson Lab, the meeting will be held in room ARC 231

Agenda

  • ESH&Q minute - Clean and recycle
  • Announcements - Budget
    • training - ensure up to date
    • Manpower
  • Solenoid Test Status *
  • FDC construction update
  • Upcoming work
    • FDC practice foils, motion stage, Readiness review, lights
    • BCAL Wedges
    • Solenoid 3
    • Solenoid 2
    • Permanent magnets
    • Collimator cave - install stands
    • Platform - install this summer

Open Action Items

  • Permanent Magnet chambers reworked/leak check chambers
  • Remove vacuum chamber and build/install new
  • Need to make sure access to BCAL wedges in ESB (Tom)
  • Block up existing BCAL boxes
  • Move coils 1 and 4 to Hall D
  • Test flow switch in Mag field - Scot
  • Tom to work with Jim F. for BCAL readout prototyoe
  • Order remaining controls items for the remaining coils - Scot

New Action Items

  • Hi-pot coil 2 and leak check and insulation

Discussions

    • In attendance C. Heck, D. Butler, A. Johnson, T. Carstens, Tim Whitlatch, S. Speigel, S. Ellis G. Humble, M. Beizer, B. Bunton, T. Mann, M. Stevens,
  • coil 3 in place - need to hi-pot
  • FDC readiness review Thursday
  • good saMPLES FOR UNIDIRECTIONAL CONDUCTIVE TAPE- RIGID FLEX TO CATHODE
  • MANY PROCEDURES WRITTEN
  • April 13 DIS tour - no work in Halld - Need BCAL wedge and solenoid coil
  • LCW flow switch trips at 5G field