March 25, 2015 Calibration

From GlueXWiki
Revision as of 18:11, 24 March 2015 by Sdobbs (Talk | contribs) (Agenda)

Jump to: navigation, search

GlueX Calibration Meeting
Wednesday, March 25, 2015
11:00 am, EDT
JLab: CEBAF Center, F326

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 630804895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/630804895.
  3. To join via phone, use one of the following numbers and the Conference ID: 630804895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4
  5. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Subdetector Reports
  3. Spring Calibration Plans
  4. Simulations
  5. AOT

Proposed Spring Plans

  1. Short-term (few days)
    1. Realign detector times
    2. Compare detector performance to fall run
  2. Medium-term (~1-2 month)
    1. Check stability of existing calibrations
    2. Improve timing calibrations
      1. Continue TDC commissioning
      2. RF time calibration
      3. Refine timewalk, etc. corrections
    3. Monitor dependence on conditions (gas mix, temperature, etc.)
  3. Long-term (summer)
    1. Improve FCAL/BCAL calibrations
    2. Improve detector alignment
    3. Update digitization in simulation