Difference between revisions of "March 26, 2024 KLONG CPS Design Meeting"

From GlueXWiki
Jump to: navigation, search
(Minutes)
(Minutes)
Line 22: Line 22:
 
** Ok to have a gap upstream of copper absorber for water lines - total shielding thickness still needed
 
** Ok to have a gap upstream of copper absorber for water lines - total shielding thickness still needed
 
** On downstream end, keep center Cu/W inner block up against the absorber (inside of the water lines) OK for gap outside this
 
** On downstream end, keep center Cu/W inner block up against the absorber (inside of the water lines) OK for gap outside this
 +
** Need to set the center of the magnet poles 2cm below beamline
  
 
== Action Items ==
 
== Action Items ==

Revision as of 14:07, 27 March 2024

Meeting Time and Place

Tuesday, March 26, 2024, 1pm Hall D Counting House

  • Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard

Agenda

Minutes

  • Reviewed minutes from last meeting
  • Discussed progress on 3D model
    • Discussed possibility of removing borated poly layer from the back side when moving CPS out of beamline
      • Pavel will check radiation levels
      • It will make more clearance for GlueX reinstall
    • Ok to have a gap upstream of copper absorber for water lines - total shielding thickness still needed
    • On downstream end, keep center Cu/W inner block up against the absorber (inside of the water lines) OK for gap outside this
    • Need to set the center of the magnet poles 2cm below beamline

Action Items