Difference between revisions of "March 5, 2021 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
Line 32: Line 32:
 
#** [https://halldweb.jlab.org/wiki-private/index.php/Spring_2020_Analysis_Launch Analysis launches] completed for batches 3, 4, 5, 8
 
#** [https://halldweb.jlab.org/wiki-private/index.php/Spring_2020_Analysis_Launch Analysis launches] completed for batches 3, 4, 5, 8
 
#* Geometric reconstruction update
 
#* Geometric reconstruction update
#** Update on shift of the time difference (Roman)
+
#** [https://web-docs.gsi.de/~rdzhigad/www/research/reconstructed-c-angle Comparison of the reconstructed Cherenkov angle with expected] (Roman)
 
#** Cherenkov PDF (Ahmed)  
 
#** Cherenkov PDF (Ahmed)  
 
#** Performance from KKπ and πππ ([https://halldweb.jlab.org/DocDB/0035/003581/003/2021_March_5_DIRC_Update_Separation_Power_kkpi.pdf Bill])
 
#** Performance from KKπ and πππ ([https://halldweb.jlab.org/DocDB/0035/003581/003/2021_March_5_DIRC_Update_Separation_Power_kkpi.pdf Bill])
 
#* FastDIRC update (Yunjie)
 
#* FastDIRC update (Yunjie)
 
# AOB
 
# AOB

Latest revision as of 11:06, 5 March 2021

Meeting Information

GlueX DIRC Meeting
Friday March 5, 2021
10:00 am, ET
Remote only

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Mirror prototype test plan (All)
    • Discussion of prototypes and ongoing tests (Bill, All)
      • Recent inspections: Wed 3/5 now at 10 weeks for half-size and 6 weeks for full-size prototype
      • Diffuser status
    • Next steps in mirror process: (Justin)
      • Keith working on production-quality mirror with full process and final mirror/borosilicate dimensions
      • Strongbacks at shop for re-anodizing
      • Borofloat ordered, expect delivery in 1-2 weeks
      • Need to schedule mirror cutting at Danny's glass
    • Other thoughts or suggestions?
  3. Electrics cooling baffles (Bill)
  4. DIRC commissioning analyses and 2020 studies (All)
  5. AOB