Difference between revisions of "March 8, 2018 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 30: Line 30:
 
#** Other items and quotes
 
#** Other items and quotes
 
#* Geometry for alignment studies (Bill)
 
#* Geometry for alignment studies (Bill)
# Simulation studies (Maria and Roman)
+
# Simulation studies (Maria and Roman) ([https://web-docs.gsi.de/~rdzhigad/www/research/pionkaon-sep-power pi/K separation power])
 
# MAPMT testing (Bill)
 
# MAPMT testing (Bill)
 
# AOB
 
# AOB

Revision as of 08:36, 8 March 2018

Meeting Information

GlueX DIRC Meeting
Thursday March 8, 2018
10:00 am, EDT
JLab room F326

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Support structure update (John, Tim, Tom, Mark)
    • Investigations bar box and optical box movement in the hall
    • Roll fixture testing
  3. Bar box transportation (dates chosen)
    • May 29 - 31: loading at SLAC
    • June 6-7: delivery to JLab
  4. Optical box
    • Status update (Ernie and Jason)
      • Box production at Lesker: final production drawings (?)
      • PMT test fixture
      • 3D Model status
      • Other items and quotes
    • Geometry for alignment studies (Bill)
  5. Simulation studies (Maria and Roman) (pi/K separation power)
  6. MAPMT testing (Bill)
  7. AOB