# Assemble the second SiPM puller to send to USM (Scot) | # Assemble the second SiPM puller to send to USM (Scot) | ||
# Order and assemble a third SiPM puller as a backup for JLab (Jim and Scot) | # Order and assemble a third SiPM puller as a backup for JLab (Jim and Scot) | ||
+ | # Setup clean tents in the ESB for gluing light guides. Prepare a plan for production testing. (Elton, Tom) | ||
== Tentative Agenda == | == Tentative Agenda == |
Revision as of 17:34, 26 April 2012
Action Items from previous meetings
- Determine if swapped bias pins was accidental or in design (Chris)
- Develop front and back views of jumper sheets. Also get latest version of drawings (Jack)
- Check into AC units based on Peltier coolers for SiPM production tests (Fernando)
- Assemble the second SiPM puller to send to USM (Scot)
- Order and assemble a third SiPM puller as a backup for JLab (Jim and Scot)
- Setup clean tents in the ESB for gluing light guides. Prepare a plan for production testing. (Elton, Tom)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM production testing (everyone)
- Mechanical assembly (Scot)
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Temperature compensation (Jack)
- Preamp-summing (Chris)
Minutes
Attending: