Difference between revisions of "May 10, 2011 SiPM Electrical and Cooling"
From GlueXWiki
(→Tentative Agenda) |
(→Tentative Agenda) |
||
Line 13: | Line 13: | ||
# Action Items | # Action Items | ||
# Schedule, reporting, and manpower (Elton) | # Schedule, reporting, and manpower (Elton) | ||
+ | # Beam test experience (Elton) | ||
+ | #* Connections to RTD | ||
+ | #* Installation and space for monitoring control board | ||
# SiPM production testing (everyone) | # SiPM production testing (everyone) | ||
# Mechanical assembly (Scot) | # Mechanical assembly (Scot) |
Revision as of 07:26, 10 May 2012
Action Items from previous meetings
- Determine if swapped bias pins was accidental or in design (Chris)
- Develop front and back views of jumper sheets. Also get latest version of drawings (Jack)
- Check into AC units based on Peltier coolers for SiPM production tests (Fernando)
- Assemble the second SiPM puller to send to USM (Scot)
- Order and assemble a third SiPM puller as a backup for JLab (Jim and Scot)
- Setup clean tents in the ESB for gluing light guides. Prepare a plan for production testing. (Elton, Tom)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- Beam test experience (Elton)
- Connections to RTD
- Installation and space for monitoring control board
- SiPM production testing (everyone)
- Mechanical assembly (Scot)
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Temperature compensation (Jack)
- Preamp-summing (Chris)
- Light guide gluing setup
Minutes
Attending: