Difference between revisions of "May 10, 2011 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Tentative Agenda)
Line 13: Line 13:
 
# Action Items
 
# Action Items
 
# Schedule, reporting, and manpower (Elton)
 
# Schedule, reporting, and manpower (Elton)
 +
# Beam test experience (Elton)
 +
#* Connections to RTD
 +
#* Installation and space for monitoring control board
 
# SiPM production testing (everyone)
 
# SiPM production testing (everyone)
 
# Mechanical assembly (Scot)
 
# Mechanical assembly (Scot)

Revision as of 07:26, 10 May 2012

Action Items from previous meetings

  1. Determine if swapped bias pins was accidental or in design (Chris)
  2. Develop front and back views of jumper sheets. Also get latest version of drawings (Jack)
  3. Check into AC units based on Peltier coolers for SiPM production tests (Fernando)
  4. Assemble the second SiPM puller to send to USM (Scot)
  5. Order and assemble a third SiPM puller as a backup for JLab (Jim and Scot)
  6. Setup clean tents in the ESB for gluing light guides. Prepare a plan for production testing. (Elton, Tom)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. Beam test experience (Elton)
    • Connections to RTD
    • Installation and space for monitoring control board
  5. SiPM production testing (everyone)
  6. Mechanical assembly (Scot)
  7. Mechanical (Jim)
  8. Mechanical drawings (Chuck)
  9. Temperature compensation (Jack)
  10. Preamp-summing (Chris)
  11. Light guide gluing setup

Minutes

Attending: