Difference between revisions of "May 13, 2022 Tech group SAD meeting"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
Line 6: Line 6:
  
  
* Safety - collimator cave Active collimator access
+
* Safety - new COVID message fro Steve Hoey
 +
* Key validation due this month
 
* Hall will most likely be locked up 3 weeks from today!
 
* Hall will most likely be locked up 3 weeks from today!
 
* still no budget to buy FCAL2 stuff
 
* still no budget to buy FCAL2 stuff

Latest revision as of 09:29, 13 May 2022

Meeting Time and Place =

Friday May 13, 2022 10:30am Hall D Counting House and Teams

Agenda

  • Safety - new COVID message fro Steve Hoey
  • Key validation due this month
  • Hall will most likely be locked up 3 weeks from today!
  • still no budget to buy FCAL2 stuff
  • Accelerator schedule - tunnel may be locked up soon to injector dump
  • Hall D SAD Tasks
    • CPP INstall O:\halld_engineering\Installation Schedules
      • Moveable Lead absorber - Tim to Write procedure
      • Target - re-surveyed - Tim to write procedure
      • Gas - Scot/Chris
      • Helium bag Installed
        He bag.jpg
        Hebag assy.png
        installed
    • PS Parasitic Detectors stages - low priority
    • FCAL Insert Module fabrication
      • 40 brass straps per week needed, maybe 60 now?
      • matching mu metal to steel shields
      • cutting tool
      • Moving tent end of June to EEL 108
    • Tagger NMR repair and HCO - Scot
    • Tagger controls/network switch UPS
    • Solenoid Turbo replace - Keith
    • Solenoid HCO
    • Move active collimator to 3.4mm hole - surveyed
    • Goniometer light replace
    • Downstream vacuum pipe install - next week
    • Add casters to Microscope stand
    • Rebuild Goni diaphragm pump - complete
  • TEDF work area move in June to test lab high bay or ESB
  • FCAL Insert Drawings - 98% complete
    • need cooling pipe to chiller assy
    • need dark room mod for eelectronic patch panels
    • need to complete 0200 final assy dwg
    • need installation drawing
    • Procurement plan developed
  • New Profiler install - Will not be ready
  • New 3x3 CCAL for TAC - install Tuesday - Survey thursdayMedia:CPP_TAC.pdf
    TAC-3x3.png
  • Tagger Radiator Mod - completeMedia:Fork_mod.pdf
  • DIRC water skid and fiber hookup
  • Controls
    • FDC chiller cooling water flow -
    • FDC start up procedure with set point error - restarted yesterday, any issues?
    • HCO started...
  • General Maintenance
  • On Call - Keith
  • ePAS Training and trial https://www.jlab.org/esh/epas

Action Items

  • Prepare for HCO