Difference between revisions of "May 13, 2022 Tech group SAD meeting"
From GlueXWiki
(Created page with "= Meeting Time and Place == Friday May 13, 2022 10:30am Hall D Counting House and Teams == Agenda == * Safety - collimator cave Active collimator access * Hall will most li...") |
(→Agenda) |
||
Line 40: | Line 40: | ||
* New Profiler install - Will not be ready | * New Profiler install - Will not be ready | ||
* New 3x3 CCAL for TAC - install Tuesday - Survey thursday[[Media:CPP_TAC.pdf]][[image:TAC-3x3.png|thumb]] | * New 3x3 CCAL for TAC - install Tuesday - Survey thursday[[Media:CPP_TAC.pdf]][[image:TAC-3x3.png|thumb]] | ||
− | * Tagger Radiator Mod [[Media:Fork_mod.pdf]] | + | * Tagger Radiator Mod - complete[[Media:Fork_mod.pdf]] |
+ | * DIRC water skid and fiber hookup | ||
* Controls | * Controls | ||
** FDC chiller cooling water flow - | ** FDC chiller cooling water flow - |
Revision as of 09:28, 13 May 2022
Meeting Time and Place =
Friday May 13, 2022 10:30am Hall D Counting House and Teams
Agenda
- Safety - collimator cave Active collimator access
- Hall will most likely be locked up 3 weeks from today!
- still no budget to buy FCAL2 stuff
- Accelerator schedule - tunnel may be locked up soon to injector dump
- Hall D SAD Tasks
- CPP INstall O:\halld_engineering\Installation Schedules
- Moveable Lead absorber - Tim to Write procedure
- Target - re-surveyed - Tim to write procedure
- Gas - Scot/Chris
- Helium bag Installed installed
- PS Parasitic Detectors stages - low priority
- FCAL Insert Module fabrication
- 40 brass straps per week needed, maybe 60 now?
- matching mu metal to steel shields
- cutting tool
- Moving tent end of June to EEL 108
- Tagger NMR repair and HCO - Scot
- Tagger controls/network switch UPS
- Solenoid Turbo replace - Keith
- Solenoid HCO
- Move active collimator to 3.4mm hole - surveyed
- Goniometer light replace
- Downstream vacuum pipe install - next week
- Add casters to Microscope stand
- Rebuild Goni diaphragm pump - complete
- CPP INstall O:\halld_engineering\Installation Schedules
- TEDF work area move in June to test lab high bay or ESB
- FCAL Insert Drawings - 98% complete
- need cooling pipe to chiller assy
- need dark room mod for eelectronic patch panels
- need to complete 0200 final assy dwg
- need installation drawing
- Procurement plan developed
- New Profiler install - Will not be ready
- New 3x3 CCAL for TAC - install Tuesday - Survey thursdayMedia:CPP_TAC.pdf
- Tagger Radiator Mod - completeMedia:Fork_mod.pdf
- DIRC water skid and fiber hookup
- Controls
- FDC chiller cooling water flow -
- FDC start up procedure with set point error - restarted yesterday, any issues?
- HCO started...
- General Maintenance
- On Call - Keith
- ePAS Training and trial https://www.jlab.org/esh/epas
Action Items
- Prepare for HCO