Difference between revisions of "May 15, 2012 Readout"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Tentative Agenda)
Line 30: Line 30:
 
# Update from USM
 
# Update from USM
 
## [https://halldweb1.jlab.org/wiki/images/a/a5/USM_report_15.pdf Production manager report (Javiera Quiroz]
 
## [https://halldweb1.jlab.org/wiki/images/a/a5/USM_report_15.pdf Production manager report (Javiera Quiroz]
## A study of PDE from station 3 (Orlando Soto)
+
## [https://halldweb1.jlab.org/wiki/images/5/54/Pde_estimation.pdf A study of PDE from station 3 (Orlando Soto)]
 
## [http://atlasusr.fis.utfsm.cl:8000/ USM Web Interface to DB]
 
## [http://atlasusr.fis.utfsm.cl:8000/ USM Web Interface to DB]
 
# Status of Testing at JLab
 
# Status of Testing at JLab

Revision as of 11:02, 15 May 2012

Teleconference Time: 11:00 a.m. EST

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • Phone connection only upon request.
    • +1-866-740-1260 : US and Canada
    • +1-303-248-0285 : International
    • then use participant code: 3421244# (the # is needed when using the phone)
    • OR from www.readytalk.com type access code 3421244 into "join a meeting" without the # (you need java plugin)

Participant Direct Lines

  • JLab Phone: in CC F326 is 757-269-6337 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947

Items for followup from previous meeting

  1. Send drawings of light guide gauges to USM (Elton) sent e-mail yesterday
  2. SiPMs
    • Plot dark rate of SiPM measurements under the same conditions as for Hamamatsu for each of comparison (Orlando and Serguei)

Presentations from recent meetings

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Talks at the Collaboration Meeting May 21-23
  4. Update from USM
    1. Production manager report (Javiera Quiroz
    2. A study of PDE from station 3 (Orlando Soto)
    3. USM Web Interface to DB
  5. Status of Testing at JLab
    1. Hall-D ELOG.
  6. BCAL Beam Tests 2012
    • Updates (Elton)
    • Discussion of data and additional work needed
  7. Other

Minutes

Attending: