** Solid target installation
 
** Solid target installation
 
** Installation drawing including Microscope move
 
** Installation drawing including Microscope move
 +
 +
== Minutes and Action Items ==
 +
* Need to set up low flow nitrogen setup for detector electronics cooling (Tim)
 +
* Chambers should be coming from UMASS the week of June 6
 +
* Mark to devise plan to unload chambers from uhaul at EEL
 +
* Elton to let Christian Whalen know the chambers are coming
 +
* Beni to complete the OSP for the test in EEL 126
 +
* Tim to setup meeting in Hall to finalize cable runs and length
 +
* Test cables were found in the dumb waiter
 +
* Mark Dalton to update Darkroom OSP

Latest revision as of 07:16, 3 June 2021

Meeting Time and Place

Thursday May 20, 2021, 3:30pm Bluejeans https://bluejeans.com/465620466

  • Present - Elton, Dave, Stephanie, Ilya, Rory, Mark S, Beni, Simon, Mark I

Agenda

  • Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/May_06,_2021_CPP_Design_Meeting
  • Microscope move
    • Was limited by magnet stand in current position
  • Gas system status
  • Plan for bringing/checking chambers from UMASS
    • OSP
  • Nitrogen purge desired on electronics volume
  • Cable routings
  • Design/Fab/Procurement status
    • Stand
    • Steel
    • Fcal platform mods
  • Things to work out
    • Gas system, manifold/bubblers (Beni has some)
    • Complete structural analysis
    • Develop Detailed installation plan
    • Develop Design/operational/Maintenance Requirements
    • Modified US vacuum system
    • Solid target installation
    • Installation drawing including Microscope move

Minutes and Action Items

  • Need to set up low flow nitrogen setup for detector electronics cooling (Tim)
  • Chambers should be coming from UMASS the week of June 6
  • Mark to devise plan to unload chambers from uhaul at EEL
  • Elton to let Christian Whalen know the chambers are coming
  • Beni to complete the OSP for the test in EEL 126
  • Tim to setup meeting in Hall to finalize cable runs and length
  • Test cables were found in the dumb waiter
  • Mark Dalton to update Darkroom OSP