Difference between revisions of "May 20, 2022 Tech group SAD meeting"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
(9 intermediate revisions by the same user not shown)
Line 6: Line 6:
  
  
* Safety -  Electrical HV
+
* Safety -  Electrical https://logbooks.jlab.org/entry/3993462
 
* Key validation due this month
 
* Key validation due this month
 
* Hall will most likely be locked up 2 weeks from today!
 
* Hall will most likely be locked up 2 weeks from today!
* still no budget to buy FCAL2 stuff
+
* First wave of FCAL2 PR approved $17K for Support plates, $24K cooling blocks waiting for signature
* Accelerator schedule - HCO in full gear
+
* Accelerator schedule - HCO in full gear https://cebaf.jlab.org/calendar/
 
* Hall D SAD Tasks  
 
* Hall D SAD Tasks  
 
** CPP INstall  Completed  
 
** CPP INstall  Completed  
 +
*** Adjust Lead absorber procedure
 +
*** Change Target procedure
 
** PS Parasitic Detectors stages - low priority
 
** PS Parasitic Detectors stages - low priority
 
** FCAL Insert Module fabrication
 
** FCAL Insert Module fabrication
Line 22: Line 24:
 
** Tagger controls/network switch UPS
 
** Tagger controls/network switch UPS
 
** Solenoid HCO - complete
 
** Solenoid HCO - complete
** Downstream vacuum pipe install - complete - turn pump back on in final HCO
+
** Downstream vacuum pipe install - complete - turn pump back on in final HCO [[image:Lum_mon.jpg|thumb]]
 
** Add casters to Microscope stand
 
** Add casters to Microscope stand
 
* TEDF work area move in June to test lab high bay or ESB
 
* TEDF work area move in June to test lab high bay or ESB
 
* FCAL Insert Drawings - 98% complete
 
* FCAL Insert Drawings - 98% complete
 
** need cooling pipe to chiller assy
 
** need cooling pipe to chiller assy
** need dark room mod for eelectronic patch panels
+
** need dark room mod for electronic patch panels
 
** need to complete 0200 final assy dwg
 
** need to complete 0200 final assy dwg
 
** need installation drawing
 
** need installation drawing
 
** Procurement plan developed
 
** Procurement plan developed
 
* New Profiler install - not until August - new plates arrived
 
* New Profiler install - not until August - new plates arrived
* New 3x3 CCAL for TAC - cabling to be done [[image:TAC-3x3_in.jpg|thumb]]  
+
* New 3x3 CCAL for TAC - cabling to be done [[image:TAC-3x3_in.jpg|thumb]] [[image:3x3_in.jpg|thumb]]
* Tagger Radiator Mod - complete[[Media:Fork_mod.pdf]]
+
 
* DIRC water skid and fiber hookup
 
* DIRC water skid and fiber hookup
 
* Controls
 
* Controls
 
** FDC chiller cooling water flow -  
 
** FDC chiller cooling water flow -  
 
** FDC start up procedure with set point error - restarted yesterday, any issues?
 
** FDC start up procedure with set point error - restarted yesterday, any issues?
** HCO started...
+
* HCO started...https://accweb.acc.jlab.org/hco/readiness?categoryId=&systemId=&regionId=&groupId=&qualified=
 
* General Maintenance
 
* General Maintenance
 
* On Call - Keith
 
* On Call - Keith
 
* ePAS Training and trial  https://www.jlab.org/esh/epas
 
* ePAS Training and trial  https://www.jlab.org/esh/epas
 +
* Tidy Friday? Thorough cleaning next week?
  
 
== Action Items ==
 
== Action Items ==
  
* Prepare for HCO
+
* Complete HCO
 +
* Get Keith fully trained on Brass straps
 +
* DIRC water skid start up

Latest revision as of 10:01, 20 May 2022

Meeting Time and Place =

Friday May 20, 2022 10:30am Hall D Counting House and Teams

Agenda

  • Safety - Electrical https://logbooks.jlab.org/entry/3993462
  • Key validation due this month
  • Hall will most likely be locked up 2 weeks from today!
  • First wave of FCAL2 PR approved $17K for Support plates, $24K cooling blocks waiting for signature
  • Accelerator schedule - HCO in full gear https://cebaf.jlab.org/calendar/
  • Hall D SAD Tasks
    • CPP INstall Completed
      • Adjust Lead absorber procedure
      • Change Target procedure
    • PS Parasitic Detectors stages - low priority
    • FCAL Insert Module fabrication
      • 60 brass straps per week needed now?
      • matching mu metal to steel shields
      • cutting tool
      • Moving tent end of June to EEL 108
    • Tagger NMR repair and HCO - Scot
    • Tagger controls/network switch UPS
    • Solenoid HCO - complete
    • Downstream vacuum pipe install - complete - turn pump back on in final HCO
      Lum mon.jpg
    • Add casters to Microscope stand
  • TEDF work area move in June to test lab high bay or ESB
  • FCAL Insert Drawings - 98% complete
    • need cooling pipe to chiller assy
    • need dark room mod for electronic patch panels
    • need to complete 0200 final assy dwg
    • need installation drawing
    • Procurement plan developed
  • New Profiler install - not until August - new plates arrived
  • New 3x3 CCAL for TAC - cabling to be done
    TAC-3x3 in.jpg
    3x3 in.jpg
  • DIRC water skid and fiber hookup
  • Controls
    • FDC chiller cooling water flow -
    • FDC start up procedure with set point error - restarted yesterday, any issues?
  • HCO started...https://accweb.acc.jlab.org/hco/readiness?categoryId=&systemId=&regionId=&groupId=&qualified=
  • General Maintenance
  • On Call - Keith
  • ePAS Training and trial https://www.jlab.org/esh/epas
  • Tidy Friday? Thorough cleaning next week?

Action Items

  • Complete HCO
  • Get Keith fully trained on Brass straps
  • DIRC water skid start up