Difference between revisions of "May 20, 2022 Tech group SAD meeting"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
(8 intermediate revisions by the same user not shown) | |||
Line 6: | Line 6: | ||
− | * Safety - Electrical | + | * Safety - Electrical https://logbooks.jlab.org/entry/3993462 |
* Key validation due this month | * Key validation due this month | ||
* Hall will most likely be locked up 2 weeks from today! | * Hall will most likely be locked up 2 weeks from today! | ||
− | * | + | * First wave of FCAL2 PR approved $17K for Support plates, $24K cooling blocks waiting for signature |
− | * Accelerator schedule - HCO in full gear | + | * Accelerator schedule - HCO in full gear https://cebaf.jlab.org/calendar/ |
* Hall D SAD Tasks | * Hall D SAD Tasks | ||
** CPP INstall Completed | ** CPP INstall Completed | ||
+ | *** Adjust Lead absorber procedure | ||
+ | *** Change Target procedure | ||
** PS Parasitic Detectors stages - low priority | ** PS Parasitic Detectors stages - low priority | ||
** FCAL Insert Module fabrication | ** FCAL Insert Module fabrication | ||
Line 22: | Line 24: | ||
** Tagger controls/network switch UPS | ** Tagger controls/network switch UPS | ||
** Solenoid HCO - complete | ** Solenoid HCO - complete | ||
− | ** Downstream vacuum pipe install - complete - turn pump back on in final HCO | + | ** Downstream vacuum pipe install - complete - turn pump back on in final HCO [[image:Lum_mon.jpg|thumb]] |
** Add casters to Microscope stand | ** Add casters to Microscope stand | ||
* TEDF work area move in June to test lab high bay or ESB | * TEDF work area move in June to test lab high bay or ESB | ||
* FCAL Insert Drawings - 98% complete | * FCAL Insert Drawings - 98% complete | ||
** need cooling pipe to chiller assy | ** need cooling pipe to chiller assy | ||
− | ** need dark room mod for | + | ** need dark room mod for electronic patch panels |
** need to complete 0200 final assy dwg | ** need to complete 0200 final assy dwg | ||
** need installation drawing | ** need installation drawing | ||
** Procurement plan developed | ** Procurement plan developed | ||
* New Profiler install - not until August - new plates arrived | * New Profiler install - not until August - new plates arrived | ||
− | * New 3x3 CCAL for TAC - cabling to be done [[image:TAC-3x3_in.jpg|thumb]] | + | * New 3x3 CCAL for TAC - cabling to be done [[image:TAC-3x3_in.jpg|thumb]] [[image:3x3_in.jpg|thumb]] |
* DIRC water skid and fiber hookup | * DIRC water skid and fiber hookup | ||
* Controls | * Controls | ||
Line 41: | Line 43: | ||
* On Call - Keith | * On Call - Keith | ||
* ePAS Training and trial https://www.jlab.org/esh/epas | * ePAS Training and trial https://www.jlab.org/esh/epas | ||
+ | * Tidy Friday? Thorough cleaning next week? | ||
== Action Items == | == Action Items == | ||
− | * | + | * Complete HCO |
+ | * Get Keith fully trained on Brass straps | ||
+ | * DIRC water skid start up |
Latest revision as of 10:01, 20 May 2022
Meeting Time and Place =
Friday May 20, 2022 10:30am Hall D Counting House and Teams
Agenda
- Safety - Electrical https://logbooks.jlab.org/entry/3993462
- Key validation due this month
- Hall will most likely be locked up 2 weeks from today!
- First wave of FCAL2 PR approved $17K for Support plates, $24K cooling blocks waiting for signature
- Accelerator schedule - HCO in full gear https://cebaf.jlab.org/calendar/
- Hall D SAD Tasks
- CPP INstall Completed
- Adjust Lead absorber procedure
- Change Target procedure
- PS Parasitic Detectors stages - low priority
- FCAL Insert Module fabrication
- 60 brass straps per week needed now?
- matching mu metal to steel shields
- cutting tool
- Moving tent end of June to EEL 108
- Tagger NMR repair and HCO - Scot
- Tagger controls/network switch UPS
- Solenoid HCO - complete
- Downstream vacuum pipe install - complete - turn pump back on in final HCO
- Add casters to Microscope stand
- CPP INstall Completed
- TEDF work area move in June to test lab high bay or ESB
- FCAL Insert Drawings - 98% complete
- need cooling pipe to chiller assy
- need dark room mod for electronic patch panels
- need to complete 0200 final assy dwg
- need installation drawing
- Procurement plan developed
- New Profiler install - not until August - new plates arrived
- New 3x3 CCAL for TAC - cabling to be done
- DIRC water skid and fiber hookup
- Controls
- FDC chiller cooling water flow -
- FDC start up procedure with set point error - restarted yesterday, any issues?
- HCO started...https://accweb.acc.jlab.org/hco/readiness?categoryId=&systemId=®ionId=&groupId=&qualified=
- General Maintenance
- On Call - Keith
- ePAS Training and trial https://www.jlab.org/esh/epas
- Tidy Friday? Thorough cleaning next week?
Action Items
- Complete HCO
- Get Keith fully trained on Brass straps
- DIRC water skid start up