Line 11: Line 11:
 
* Design/Fab/Install schedule [[Media:CPP_install_schedule.pdf]]  
 
* Design/Fab/Install schedule [[Media:CPP_install_schedule.pdf]]  
 
* 3D model - show progress
 
* 3D model - show progress
 +
* Upcoming run, possible tests [[Media:CPP_Tests.pdf]]
 
* Things to work out
 
* Things to work out
 
** Gas line manifold
 
** Gas line manifold
 +
** Adjustable lead absorber
 
** Procurement/installation schedule
 
** Procurement/installation schedule
 
** Alignment hardware
 
** Alignment hardware
 
** Electronics shielding [[Media:Muon_Chamber_Shielding.pdf]]
 
** Electronics shielding [[Media:Muon_Chamber_Shielding.pdf]]
** Grounding cutouts in steel
 
 
** Complete structural analysis
 
** Complete structural analysis
 
** Develop installation plan
 
** Develop installation plan
Line 23: Line 24:
 
== Minutes and Action Items ==
 
== Minutes and Action Items ==
 
*Reviewed minutes of last meeting
 
*Reviewed minutes of last meeting
 
+
* Discussed RF shielding over electronics board - they will be capped at the ends - UMASS will have them fabricated
 +
* The new chambers have a 2" hole in the center - this will be uncovered during installation
 +
* The hole in all the iron pieces to be 8cm square with radius corners
 +
* Hole in stationary lead to be 10cm square with radius corners
 +
* Adjustable lead to be 14cm square with 8cm square hole,10cm thick. +/- 1cm movement and must be locally adjustable
 +
* material for lead adjustment should be somewhat symmetrical and consistent all around
 +
* we should plan on removing the vertical cable organizers since things are getting tight
 +
* Discussed possible testing scenarios for the summer run - need to make decision on configurations
 +
* Next meeting we can go over possible procurements
 
* Set up new meeting in 2 weeks
 
* Set up new meeting in 2 weeks

Latest revision as of 06:31, 4 June 2020

Meeting Time and Place =

Thursday May 21, 2020, 1:30pm Bluejeans https://bluejeans.com/735541157/3638?src=calendarLink

  • Present - Elton, Dave, Stephanie, Llya, Rory (remote)

Agenda

Minutes and Action Items

  • Reviewed minutes of last meeting
  • Discussed RF shielding over electronics board - they will be capped at the ends - UMASS will have them fabricated
  • The new chambers have a 2" hole in the center - this will be uncovered during installation
  • The hole in all the iron pieces to be 8cm square with radius corners
  • Hole in stationary lead to be 10cm square with radius corners
  • Adjustable lead to be 14cm square with 8cm square hole,10cm thick. +/- 1cm movement and must be locally adjustable
  • material for lead adjustment should be somewhat symmetrical and consistent all around
  • we should plan on removing the vertical cable organizers since things are getting tight
  • Discussed possible testing scenarios for the summer run - need to make decision on configurations
  • Next meeting we can go over possible procurements
  • Set up new meeting in 2 weeks