May 24, 2013 Installation

From GlueXWiki
Revision as of 18:04, 23 May 2013 by Mashephe (Talk | contribs) (Created page with "__TOC__ == Meeting Time and Place == Friday, May 24, 2013 at 1:30 PM At Jefferson Lab, the meeting will be held in F326 == Connections == To connect from the outside, please u...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Meeting Time and Place

Friday, May 24, 2013 at 1:30 PM At Jefferson Lab, the meeting will be held in F326

Connections

To connect from the outside, please use ESNET

  1. ) ESNET: 8542553
  2. )To connect by telephone (supported on request only) dial:
  • You can look up toll-free number at http://www.readytalk.com/intl
  • US and Canada: (866)740-1260 (toll free)
  • International: (303)248-0285 (toll call)
  • enter access code followed by the # sign: 3421244#

Up to GlueX/Hall-D Installation Meetings

Action Items From Last Meeting

Agenda

  1. Announcements
  2. Updates to the Mechanical Installation Schedule ( Latest Rendition of Install Schedule) (Tim)
  3. Electronics Installation Schedule (Fernando) [| Schedule]
  4. Summer manpower
  5. Magnet Status
  6. Tagger Magnet Installation
  7. Microscope Installation
  8. Tagger Array Installation
  9. Pair Spectrometer Installation
  10. BCAL Installation
  11. FCAL Installation
  12. TOF Installation
  13. FDC Installation
  14. CDC Installation
  15. A.O.B.

Minutes