Difference between revisions of "May 24, 2018 DIRC Optical Box"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 28: | Line 28: | ||
#* Discussion of [https://halldweb.jlab.org/wiki/index.php/File:DIRC_Install_Schedule.pdf schedule] (Tim, et al) | #* Discussion of [https://halldweb.jlab.org/wiki/index.php/File:DIRC_Install_Schedule.pdf schedule] (Tim, et al) | ||
# Controls discussion (All) | # Controls discussion (All) | ||
− | #* Module orientation and HV controls | + | #* Module orientation and LV/HV controls |
#* Interlocks, etc. | #* Interlocks, etc. | ||
# Discussion of assembly procedure and timeline: | # Discussion of assembly procedure and timeline: |
Revision as of 00:33, 24 May 2018
Meeting Information
GlueX DIRC Optical Box Meeting
Thursday May 24, 2018
10:00 am, EDT
JLab L207
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcement
- Optical box status
- Status update (Ernie and Jason)
- Box production at Lesker: plan for visit and delivery estimate
- PMT test fixture: Assembly procedure and discussion
- Window quotes and delivery schedule
- Dark box conceptual design
- Other items and quotes
- Status update (Ernie and Jason)
- Installation of bar boxes and optical box in Hall D
- Discussion of schedule (Tim, et al)
- Controls discussion (All)
- Module orientation and LV/HV controls
- Interlocks, etc.
- Discussion of assembly procedure and timeline:
- AOB