Difference between revisions of "May 24, 2018 DIRC Optical Box"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 1: Line 1:
 
== Meeting Information ==
 
== Meeting Information ==
 
GlueX DIRC Optical Box Meeting<br>
 
GlueX DIRC Optical Box Meeting<br>
Thursday May 24, 2018<br>
+
Thursday June 7, 2018<br>
 
10:00 am, EDT<br>
 
10:00 am, EDT<br>
JLab L207 <br>
+
JLab A110 <br>
  
 
== Connection Using Bluejeans ==
 
== Connection Using Bluejeans ==
Line 19: Line 19:
 
#* [https://halldweb.jlab.org/wiki/index.php/GlueX-II_and_DIRC_ERR Experimental Readiness Review June 25]
 
#* [https://halldweb.jlab.org/wiki/index.php/GlueX-II_and_DIRC_ERR Experimental Readiness Review June 25]
 
#* Pre-brief material online by June 15
 
#* Pre-brief material online by June 15
 +
# Controls followup (Nick)
 
# Optical box status
 
# Optical box status
 
#* Status update (Ernie and Jason)
 
#* Status update (Ernie and Jason)
#** Box production at Lesker: plan for visit and delivery estimate
+
#** Box production at Lesker: report from visit
 
#** PMT test fixture: Assembly procedure and discussion
 
#** PMT test fixture: Assembly procedure and discussion
 
#** Window quotes and delivery schedule
 
#** Window quotes and delivery schedule
Line 28: Line 29:
 
# Installation of bar boxes and optical box in Hall D
 
# Installation of bar boxes and optical box in Hall D
 
#* Discussion of installation [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3596 schedule in Hall D] (Tim, et al)
 
#* Discussion of installation [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3596 schedule in Hall D] (Tim, et al)
# [https://halldweb.jlab.org/wiki/images/c/ce/Dirc_controls_v2.pdf Controls discussion] (All)
 
#* [https://halldweb.jlab.org/wiki/images/2/2a/DIRC_Environment_11.17.pdf Environment (from November)] (Nick)
 
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3576 Module orientation and LV/HV controls]
 
#* Interlocks discussion
 
 
# Discussion of assembly procedure and timeline:
 
# Discussion of assembly procedure and timeline:
 
#* [https://halldweb.jlab.org/wiki/images/a/aa/20180220_GlueX_Assembly_Sequence.pdf Plans for assembly and testing at Bates and in Hall D]
 
#* [https://halldweb.jlab.org/wiki/images/a/aa/20180220_GlueX_Assembly_Sequence.pdf Plans for assembly and testing at Bates and in Hall D]

Revision as of 13:03, 6 June 2018

Meeting Information

GlueX DIRC Optical Box Meeting
Thursday June 7, 2018
10:00 am, EDT
JLab A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcement
  2. Controls followup (Nick)
  3. Optical box status
    • Status update (Ernie and Jason)
      • Box production at Lesker: report from visit
      • PMT test fixture: Assembly procedure and discussion
      • Window quotes and delivery schedule
      • Dark box conceptual design
      • Other items and quotes
  4. Installation of bar boxes and optical box in Hall D
  5. Discussion of assembly procedure and timeline:
  6. AOB