Difference between revisions of "May 28, 2009 Calorimetry"

From GlueXWiki
Jump to: navigation, search
 
(Tentative Agenda)
Line 23: Line 23:
  
 
# Announcements
 
# Announcements
 +
# Review of Action Items
 
# Calibration
 
# Calibration
 
# FCAL Update
 
# FCAL Update
Line 28: Line 29:
 
# BCAL Fabrication
 
# BCAL Fabrication
 
#* Preparations for construction
 
#* Preparations for construction
#* Final report on First-article fibers (Zisis)
+
#* Report on First-article fibers (Andrei)
 
# BCAL Readout
 
# BCAL Readout
 
#* Update from USM (Will)
 
#* Update from USM (Will)
#* Update on SiPMs (electronics)
+
#* SiPM electronics (Fernando)
 
#* [[Media:BCAL readout1.pdf | Review of specifications for readout]] (Elton)
 
#* [[Media:BCAL readout1.pdf | Review of specifications for readout]] (Elton)
#* Electronic summing of sensors before digitization? (Elton)
+
#* Rates in the Bcal (Sasha)
# Agenda [[GlueX-Collaboration-May-2009]] Suggested list to be refined at next working group meeting
+
#* Light guide efficiency for fm pmts (Elton)
#* Fcal update
+
#* Timing resolution of FADCs
+
#* Bcal construction
+
#* Update on Bcal readout
+
#* Report on tests of first article fibers
+
# Review of Action Items
+
  
 
=Minutes=
 
=Minutes=

Revision as of 18:10, 27 May 2009

Teleconference Time: 11:00 a.m. EST

  • EVO session
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Items for followup from previous meeting(s)

  1. Resolution studies (Blake)
    • Develop criteria for evaluating resolution studies
    • Study impact of inactive material at the end of BCAL on acceptance.
    • Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina)
  2. Review options for import/export to Chile (loans, donations, transfers, etc.)
  3. Documentation on fiber first-article
  4. Design goals for SiPM electronics
  5. Preliminary specifications for Bcal readout

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Calibration
  4. FCAL Update
  5. Simulations
  6. BCAL Fabrication
    • Preparations for construction
    • Report on First-article fibers (Andrei)
  7. BCAL Readout

Minutes