Difference between revisions of "May 28, 2009 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Tentative Agenda)
Line 33: Line 33:
 
# BCAL Readout
 
# BCAL Readout
 
#* Update from USM (Will)
 
#* Update from USM (Will)
#* SiPM electronics (Fernando)
+
#* Readout specifications using SiPMs (Fernando)
 
#* Rates in the BCAL (Sasha)
 
#* Rates in the BCAL (Sasha)
 
#* Light guide efficiency for FM PMTs ([http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1279 GlueX-doc-1279 pp 12-19]) (Elton)
 
#* Light guide efficiency for FM PMTs ([http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1279 GlueX-doc-1279 pp 12-19]) (Elton)
#* Readout specifications using SiPMs (Fernando)
 
 
#* Review of readout options (tentative July 14) discussion
 
#* Review of readout options (tentative July 14) discussion
  
 
=Minutes=
 
=Minutes=

Revision as of 08:12, 28 May 2009

Teleconference Time: 11:00 a.m. EST

  • EVO session
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Items for followup from previous meeting(s)

  1. Resolution studies (Blake)
    • Develop criteria for evaluating resolution studies
    • Study impact of inactive material at the end of BCAL on acceptance.
    • Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina)
  2. Review options for import/export to Chile (loans, donations, transfers, etc.)
  3. Documentation on fiber first-article
  4. Design goals for SiPM electronics
  5. Preliminary specifications for Bcal readout

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Calibration
  4. FCAL Update
  5. Simulations
  6. BCAL Fabrication
    • Contract (George)
    • Preparations for construction (Zisis)
    • Report on First-article fibers (Zisis)
  7. BCAL Readout
    • Update from USM (Will)
    • Readout specifications using SiPMs (Fernando)
    • Rates in the BCAL (Sasha)
    • Light guide efficiency for FM PMTs (GlueX-doc-1279 pp 12-19) (Elton)
    • Review of readout options (tentative July 14) discussion

Minutes