Difference between revisions of "May 28, 2013 Solenoid Meeting"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 5: Line 5:
 
* Discussion on Quench Details
 
* Discussion on Quench Details
 
** Probir/Renuka analysis [[Media:Quench Analysis.pdf]]___ [[Media:Quench Comparisons.pdf]]
 
** Probir/Renuka analysis [[Media:Quench Analysis.pdf]]___ [[Media:Quench Comparisons.pdf]]
** George's info  [[Media:Quench plot zoom.png]]
+
** George's info  [[Media:Quench plot zoom.png]]____ [[Media:Quench plot.png]]
[[Media:Quench plot.png]]
+
 
* Plans for low current testing
 
* Plans for low current testing
 
* Work accomplished since Quench
 
* Work accomplished since Quench

Revision as of 16:39, 28 May 2013

Tuesday May 28,2013 at 11am At Jefferson Lab, the meeting will be held in room ARC 231

Agenda

Useful Info

  • Documents available at M:\halld_engineering\Solenoid\Commissioning\Response to Quench

Meeting Minutes

Probir and Renuka discussed/presented their findings on the quench analysis and comparison to the LASS configuration. Based on this analysis there should have been a minimum of 1K margin on the superconductors for all coils. After much discussion there was speculation that the superconductors have local areas that are not as good as the short samples tested at SLAC. Still no consensus on the cause of the quench.