Difference between revisions of "May 28, 2019 DIRC"
From GlueXWiki
(Created page with "== Meeting Information == GlueX DIRC Meeting<br> Tuesday May 28, 2019<br> 1:00 pm, EDT<br> JLab F326 <br> == Connection Using Bluejeans == # To join via Polycom room system...") |
(→Agenda) |
||
(3 intermediate revisions by one other user not shown) | |||
Line 3: | Line 3: | ||
Tuesday May 28, 2019<br> | Tuesday May 28, 2019<br> | ||
1:00 pm, EDT<br> | 1:00 pm, EDT<br> | ||
− | JLab | + | JLab Hall D <br> |
== Connection Using Bluejeans == | == Connection Using Bluejeans == | ||
Line 20: | Line 20: | ||
#* Window fit check (Tim/All) | #* Window fit check (Tim/All) | ||
#* Window evaluation and cleaning (Greg/All) | #* Window evaluation and cleaning (Greg/All) | ||
− | #* Module assembly and | + | #** Installation and water fill test planned for this week |
+ | #* Module assembly and installation plans (Bill/Andrew/Greg/Yunjie) | ||
# [[Spring 2019 DIRC Commissioning]] (All) | # [[Spring 2019 DIRC Commissioning]] (All) | ||
#* Reconstruction with FastDIRC (Yunjie) | #* Reconstruction with FastDIRC (Yunjie) | ||
− | #* Commissioning analyses (Ahmed) | + | #* Commissioning analyses (Ahmed) [https://halldweb1.jlab.org/wiki/images/archive/1/1a/20190528170958%21AA_28-05-2019.pdf] |
# Software/simulations | # Software/simulations | ||
#* Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie) | #* Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie) |
Latest revision as of 13:12, 28 May 2019
Meeting Information
GlueX DIRC Meeting
Tuesday May 28, 2019
1:00 pm, EDT
JLab Hall D
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Summer installation planning:
- Window fit check (Tim/All)
- Window evaluation and cleaning (Greg/All)
- Installation and water fill test planned for this week
- Module assembly and installation plans (Bill/Andrew/Greg/Yunjie)
- Spring 2019 DIRC Commissioning (All)
- Reconstruction with FastDIRC (Yunjie)
- Commissioning analyses (Ahmed) [2]
- Software/simulations
- Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)
- FastDIRC geometry implementation and alignment work (Cris/Yunjie)
- Software overview and tasks (All)
- AOB