Difference between revisions of "May 28, 2019 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
Line 24: Line 24:
 
# [[Spring 2019 DIRC Commissioning]] (All)
 
# [[Spring 2019 DIRC Commissioning]] (All)
 
#* Reconstruction with FastDIRC (Yunjie)
 
#* Reconstruction with FastDIRC (Yunjie)
#* Commissioning analyses (Ahmed)
+
#* Commissioning analyses (Ahmed) [https://halldweb1.jlab.org/wiki/images/archive/1/1a/20190528170958%21AA_28-05-2019.pdf]
 
# Software/simulations
 
# Software/simulations
 
#* Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)
 
#* Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)

Latest revision as of 13:12, 28 May 2019

Meeting Information

GlueX DIRC Meeting
Tuesday May 28, 2019
1:00 pm, EDT
JLab Hall D

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Summer installation planning:
    • Window fit check (Tim/All)
    • Window evaluation and cleaning (Greg/All)
      • Installation and water fill test planned for this week
    • Module assembly and installation plans (Bill/Andrew/Greg/Yunjie)
  3. Spring 2019 DIRC Commissioning (All)
    • Reconstruction with FastDIRC (Yunjie)
    • Commissioning analyses (Ahmed) [2]
  4. Software/simulations
    • Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)
    • FastDIRC geometry implementation and alignment work (Cris/Yunjie)
  5. Software overview and tasks (All)
  6. AOB