Difference between revisions of "May 3, 2011 Readout"

From GlueXWiki
Jump to: navigation, search
(Minutes)
Line 34: Line 34:
  
 
= Minutes =
 
= Minutes =
''Attending:
+
''Attending:Beni, Yi, John, Tim, Elton, Eugene (JLab); Will (USM); Andrei (UofR); Christina (Athens)
  
 
# Announcements
 
# Announcements
 +
#* SiPM First Article arrays have been approved
 +
#* Jlab 6 month shutdown begins in 2 weeks. They plan to connect the accelerator north stub with the tunnel to the tagger hall during this period.
 
# Review of Action Items
 
# Review of Action Items
 +
# Monitoring (Christina)
 +
#* MOU signatures should be completed soon
 +
#* Started this week to measure the light distribution in a 1x1x0.15 m3 plexiglass pane to be used to determine how many LEDs will be needed for the Fcal monitoring system.
 +
#* Hope to have some results to present next week at the collaboration meeting.
 +
#* Asked about light guides from USM. The guides are cut but not polished. Need the guides to check the space for boards and cables.
 
# [http://www.jlab.org/Hall-D/software/wiki/images/d/d1/BCalReadoutReport3May2011.pdf USM update] [http://www.jlab.org/Hall-D/software/wiki/images/8/8e/Morepictures.pdf More Pictures]
 
# [http://www.jlab.org/Hall-D/software/wiki/images/d/d1/BCalReadoutReport3May2011.pdf USM update] [http://www.jlab.org/Hall-D/software/wiki/images/8/8e/Morepictures.pdf More Pictures]
 
# SiPM update
 
# SiPM update

Revision as of 14:50, 3 May 2011

Teleconference Time: 11:00 a.m. EST

  • ESNET 8542553 and EVO session
  • JLab Phone: in CC F326 is 757-269-6337 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947
  • Phone:
    • +1-866-740-1260 : US and Canada
    • +1-303-248-0285 : International
    • then use participant code: 3421244# (the # is needed when using the phone)
    • OR from www.readytalk.com type access code 3421244 into "join a meeting" without the # (you need java plugin)

Items for followup from previous meeting

  1. Check if connections for cooling fluid can be bent radially outward to minimize affect on photons in the gap. Yes. Simulations of impact needed.
  2. Need to get a firm number for the power dissipation in the monitoring control board (in case it is placed inside the housing box)
  3. SiPM: check cross talk between cells (Yi and Carl)

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. USM update More Pictures
  4. SiPM update
    • Regina Preliminary Tests of Hamamatsu prototype
  5. Electrical/cooling (Elton)
  6. Geometry and light guides
    1. New Geometry
    2. Current geometry of light guide in Monte Carlo
  7. Simulations

Minutes

Attending:Beni, Yi, John, Tim, Elton, Eugene (JLab); Will (USM); Andrei (UofR); Christina (Athens)

  1. Announcements
    • SiPM First Article arrays have been approved
    • Jlab 6 month shutdown begins in 2 weeks. They plan to connect the accelerator north stub with the tunnel to the tagger hall during this period.
  2. Review of Action Items
  3. Monitoring (Christina)
    • MOU signatures should be completed soon
    • Started this week to measure the light distribution in a 1x1x0.15 m3 plexiglass pane to be used to determine how many LEDs will be needed for the Fcal monitoring system.
    • Hope to have some results to present next week at the collaboration meeting.
    • Asked about light guides from USM. The guides are cut but not polished. Need the guides to check the space for boards and cables.
  4. USM update More Pictures
  5. SiPM update
    • Regina Preliminary Tests of Hamamatsu prototype
  6. Electrical/cooling (Elton)
  7. Geometry and light guides
    1. New Geometry
    2. Current geometry of light guide in Monte Carlo
  8. Simulations