Difference between revisions of "May 31, 2011 Readout"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
Line 24: Line 24:
 
# Announcements
 
# Announcements
 
# Review of Action Items
 
# Review of Action Items
# [http://www.jlab.org/Hall-D/software/wiki/images/d/d1/BCalReadoutReport3May2011.pdf USM update] [http://www.jlab.org/Hall-D/software/wiki/images/8/8e/Morepictures.pdf More Pictures]
+
# USM Update
 
# SiPM update
 
# SiPM update
 
#* Regina Preliminary Tests of Hamamatsu prototype  
 
#* Regina Preliminary Tests of Hamamatsu prototype  
 
# Electrical/cooling (Elton)
 
# Electrical/cooling (Elton)
 
# Geometry and light guides
 
# Geometry and light guides
## [https://mailman.jlab.org/pipermail/halld-cal/2011-April/000369.html New Geometry]
 
## [[Media:bcal_wedge_readout.pdf | Current geometry of light guide in Monte Carlo]]
 
 
# Simulations
 
# Simulations
  
 
= Minutes =
 
= Minutes =
 
''Attending:
 
''Attending:

Revision as of 09:47, 12 May 2011

Teleconference Time: 11:00 a.m. EST

  • ESNET 8542553 and EVO session
  • JLab Phone: in CC F326 is 757-269-6337 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947
  • Phone:
    • +1-866-740-1260 : US and Canada
    • +1-303-248-0285 : International
    • then use participant code: 3421244# (the # is needed when using the phone)
    • OR from www.readytalk.com type access code 3421244 into "join a meeting" without the # (you need java plugin)

Items for followup from previous meeting

  1. Check if connections for cooling fluid can be bent radially outward to minimize affect on photons in the gap. Yes. Simulations of impact needed.
  2. Need to get a firm number for the power dissipation in the monitoring control board (in case it is placed inside the housing box)
  3. SiPM: check cross talk between cells (Yi and Carl)

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. USM Update
  4. SiPM update
    • Regina Preliminary Tests of Hamamatsu prototype
  5. Electrical/cooling (Elton)
  6. Geometry and light guides
  7. Simulations

Minutes

Attending: