Difference between revisions of "May 31, 2011 Readout"

From GlueXWiki
Jump to: navigation, search
(Items for followup from previous meeting)
(Items for followup from previous meeting)
Line 15: Line 15:
  
 
# <strike> Check if connections for cooling fluid can be bent radially outward to minimize affect on photons in the gap.</strike> Yes. Simulations of impact needed.
 
# <strike> Check if connections for cooling fluid can be bent radially outward to minimize affect on photons in the gap.</strike> Yes. Simulations of impact needed.
# <strike> Need to get a firm number for the power dissipation in the monitoring control board (in case it  is placed inside the housing box) </strike>
+
# <strike> Need to get a firm number for the power dissipation in the monitoring control board (in case it  is placed inside the housing box) </strike> Less than 250 microW/ board.
# <strike> SiPM: check cross talk between cells (Yi and Carl) </strike> Less than 250 microW/ board.
+
# <strike> SiPM: check cross talk between cells (Yi and Carl) </strike>
  
 
= Documents to Review=
 
= Documents to Review=

Revision as of 08:51, 31 May 2011

Teleconference Time: 11:00 a.m. EST

  • ESNET 8542553 and EVO session
  • JLab Phone: in CC F326 is 757-269-6337 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947
  • Phone:
    • +1-866-740-1260 : US and Canada
    • +1-303-248-0285 : International
    • then use participant code: 3421244# (the # is needed when using the phone)
    • OR from www.readytalk.com type access code 3421244 into "join a meeting" without the # (you need java plugin)

Items for followup from previous meeting

  1. Check if connections for cooling fluid can be bent radially outward to minimize affect on photons in the gap. Yes. Simulations of impact needed.
  2. Need to get a firm number for the power dissipation in the monitoring control board (in case it is placed inside the housing box) Less than 250 microW/ board.
  3. SiPM: check cross talk between cells (Yi and Carl)

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. USM Update
  4. SiPM update
  5. Electrical/cooling (Elton)
  6. Geometry and light guides
  7. Simulations

Minutes

Attending: