Difference between revisions of "May 5, 2008 Calorimetry"

From GlueXWiki
Jump to: navigation, search
 
m (Text replacement - "http://argus.phys.uregina.ca/cgi-bin/private" to "https://halldweb.jlab.org/doc-private")
 
(19 intermediate revisions by 3 users not shown)
Line 14: Line 14:
 
# [http://www.jlab.org/Hall-D/software/ScheduleIt/ Schedule]
 
# [http://www.jlab.org/Hall-D/software/ScheduleIt/ Schedule]
  
= Tentative Agenda =
+
= Agenda =
  
# FCAL Update
 
 
# BCAL Update
 
# BCAL Update
 
#* Report on the visit to Alberta (George/Zisis)
 
#* Report on the visit to Alberta (George/Zisis)
 
#* [[Private:Fiber Specs | Fiber Specifications]] (Elton)
 
#* [[Private:Fiber Specs | Fiber Specifications]] (Elton)
 +
#* Fiber Testing (evaluation, production)
 +
# FCAL Update
 +
#* [http://www.jlab.org/Hall-D/software/wiki/images/5/5e/FADC_Maj2008a.pdf FADC time resolution measurement] (Mihajlo)
 
# Calibration system update (Christina)
 
# Calibration system update (Christina)
 +
#* [[Calibration-Monitoring]]
 
# [[GlueX-Collaboration-May-2008#Friday May 9, 2008 | Collaboration meeting]] On the schedule we have 1:15 min (what do we want to report? who?)  
 
# [[GlueX-Collaboration-May-2008#Friday May 9, 2008 | Collaboration meeting]] On the schedule we have 1:15 min (what do we want to report? who?)  
#* Fcal: a) results of light guide surface treatment, b) mechanical cell wall design c) timing measurements using the FADC
+
#* FCAL: a) results of light guide surface treatment, b) mechanical cell wall design c) timing measurements using the FADC
#* Bcal:  
+
#* BCAL: a) Construction b) Readout/SiPMs, (Carl can give an update on JLab measurements)
 
#* Calibration:
 
#* Calibration:
 +
#* Monte Carlo:
 
# Any other business
 
# Any other business
  
 
=Minutes=
 
=Minutes=
Online:
+
Participants: Elton, Beni, ELke, Christina, Matt. Mihajlo, John, Zisis, Andrei, George
 +
# BCAL
 +
#* Report on the visit to Alberta [[Media:UofAMeeting080429.pdf]]; increased role of Alberta; scheduling on the CNC machine
 +
#* Fiber specs: Elton update the specs on the DocDB ([https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=920]) with all comments he received.  It can be sent on to procurement to prepare for a bid package.  Regina findings in connection to the manufacturer's claim of fiber spectral response and no of photons produced per MeV were discussed.  A NIM article is in preparation.
 +
#* Fiber Testing: new parallel setup at JLab, absolute light output measurement, to accommodate SiPM in one line and fibers in the other.
 +
# FCAL: see link above to presentation for the collaboration meeting.  We need VXS compatibility.
 +
# Calibration and Monitoring (see link above).
 +
# Collaboration Meeting Preparations
 +
#* FCAL: 25 min; see above (Mihajlo will present); will go after Calibration and before BCAL.
 +
#* BCAL: two sessions totaling 40 min each; Elton will contact Curtis to change agenda and use Electronics time for the calorimetry section.  Carl will need 30 min, and Calorimetry Review final report discussion (30 min).
 +
#* Calibration: 10 min plus a summary slide of detector requirements.  We will start with Calibration.
 +
#* Monte Carlo: Zisis will contact David and present standalone BCAL stuff during the Thu afternoon session.
 +
# Other business: Fall collaboration meeting dates should be fixed at next week's meeting.

Latest revision as of 17:12, 24 February 2017

Connection

  • The meeting will be held at 10:30 am ET
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Reference Documents

  1. Previous minutes: April 21, 2008 Calorimetry
  2. Schedule, Tracker and Drawings (gluex pass)
  3. Schedule

Agenda

  1. BCAL Update
    • Report on the visit to Alberta (George/Zisis)
    • Fiber Specifications (Elton)
    • Fiber Testing (evaluation, production)
  2. FCAL Update
  3. Calibration system update (Christina)
  4. Collaboration meeting On the schedule we have 1:15 min (what do we want to report? who?)
    • FCAL: a) results of light guide surface treatment, b) mechanical cell wall design c) timing measurements using the FADC
    • BCAL: a) Construction b) Readout/SiPMs, (Carl can give an update on JLab measurements)
    • Calibration:
    • Monte Carlo:
  5. Any other business

Minutes

Participants: Elton, Beni, ELke, Christina, Matt. Mihajlo, John, Zisis, Andrei, George

  1. BCAL
    • Report on the visit to Alberta Media:UofAMeeting080429.pdf; increased role of Alberta; scheduling on the CNC machine
    • Fiber specs: Elton update the specs on the DocDB ([1]) with all comments he received. It can be sent on to procurement to prepare for a bid package. Regina findings in connection to the manufacturer's claim of fiber spectral response and no of photons produced per MeV were discussed. A NIM article is in preparation.
    • Fiber Testing: new parallel setup at JLab, absolute light output measurement, to accommodate SiPM in one line and fibers in the other.
  2. FCAL: see link above to presentation for the collaboration meeting. We need VXS compatibility.
  3. Calibration and Monitoring (see link above).
  4. Collaboration Meeting Preparations
    • FCAL: 25 min; see above (Mihajlo will present); will go after Calibration and before BCAL.
    • BCAL: two sessions totaling 40 min each; Elton will contact Curtis to change agenda and use Electronics time for the calorimetry section. Carl will need 30 min, and Calorimetry Review final report discussion (30 min).
    • Calibration: 10 min plus a summary slide of detector requirements. We will start with Calibration.
    • Monte Carlo: Zisis will contact David and present standalone BCAL stuff during the Thu afternoon session.
  5. Other business: Fall collaboration meeting dates should be fixed at next week's meeting.