Difference between revisions of "May 5, 2008 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Tentative Agenda)
Line 23: Line 23:
 
# [[GlueX-Collaboration-May-2008#Friday May 9, 2008 | Collaboration meeting]] On the schedule we have 1:15 min (what do we want to report? who?)  
 
# [[GlueX-Collaboration-May-2008#Friday May 9, 2008 | Collaboration meeting]] On the schedule we have 1:15 min (what do we want to report? who?)  
 
#* FCAL: a) results of light guide surface treatment, b) mechanical cell wall design c) timing measurements using the FADC
 
#* FCAL: a) results of light guide surface treatment, b) mechanical cell wall design c) timing measurements using the FADC
#* BCAL: a) Construction b) Readout/SiPMs
+
#* BCAL: a) Construction b) Readout/SiPMs, (Carl can give an update on JLab measurements)
 
#* Calibration:
 
#* Calibration:
 
#* Monte Carlo:
 
#* Monte Carlo:

Revision as of 12:06, 3 May 2008

Connection

  • The meeting will be held at 10:30 am ET
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Reference Documents

  1. Previous minutes: April 21, 2008 Calorimetry
  2. Schedule, Tracker and Drawings (gluex pass)
  3. Schedule

Tentative Agenda

  1. BCAL Update
  2. FCAL Update
  3. Calibration system update (Christina)
  4. Collaboration meeting On the schedule we have 1:15 min (what do we want to report? who?)
    • FCAL: a) results of light guide surface treatment, b) mechanical cell wall design c) timing measurements using the FADC
    • BCAL: a) Construction b) Readout/SiPMs, (Carl can give an update on JLab measurements)
    • Calibration:
    • Monte Carlo:
  5. Any other business

Minutes

Online: