Difference between revisions of "May 5, 2008 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Tentative Agenda)
Line 14: Line 14:
 
# [http://www.jlab.org/Hall-D/software/ScheduleIt/ Schedule]
 
# [http://www.jlab.org/Hall-D/software/ScheduleIt/ Schedule]
  
= Tentative Agenda =
+
= Agenda =
  
 
# BCAL Update
 
# BCAL Update
 
#* Report on the visit to Alberta (George/Zisis)
 
#* Report on the visit to Alberta (George/Zisis)
 
#* [[Private:Fiber Specs | Fiber Specifications]] (Elton)
 
#* [[Private:Fiber Specs | Fiber Specifications]] (Elton)
 +
#* Fiber Testing (evaluation, production)
 
# FCAL Update
 
# FCAL Update
 
# Calibration system update (Christina)
 
# Calibration system update (Christina)

Revision as of 10:08, 5 May 2008

Connection

  • The meeting will be held at 10:30 am ET
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Reference Documents

  1. Previous minutes: April 21, 2008 Calorimetry
  2. Schedule, Tracker and Drawings (gluex pass)
  3. Schedule

Agenda

  1. BCAL Update
    • Report on the visit to Alberta (George/Zisis)
    • Fiber Specifications (Elton)
    • Fiber Testing (evaluation, production)
  2. FCAL Update
  3. Calibration system update (Christina)
  4. Collaboration meeting On the schedule we have 1:15 min (what do we want to report? who?)
    • FCAL: a) results of light guide surface treatment, b) mechanical cell wall design c) timing measurements using the FADC
    • BCAL: a) Construction b) Readout/SiPMs, (Carl can give an update on JLab measurements)
    • Calibration:
    • Monte Carlo:
  5. Any other business

Minutes

Online: