Difference between revisions of "May 5, 2008 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Minutes)
(Minutes)
Line 34: Line 34:
 
# BCAL
 
# BCAL
 
#* Report on the visit to Alberta [[Media:UofAMeeting080429.pdf]]; increased role of Alberta; scheduling on the CNC machine
 
#* Report on the visit to Alberta [[Media:UofAMeeting080429.pdf]]; increased role of Alberta; scheduling on the CNC machine
#* Fiber specs: Elton update the specs on the DocDB ([http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=920]) with all comments he received.  It can be sent on to procurement to prepare for a bid package.
+
#* Fiber specs: Elton update the specs on the DocDB ([http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=920]) with all comments he received.  It can be sent on to procurement to prepare for a bid package.  Regina findings in connection to the manufacturer's claim of fiber spectral response and no of photons produced per MeV were discussed.  A NIM article is in preparation.
#* Fiber
+
#* Fiber Testing: new parallel setup at JLab, absolute light output measurement, to accommodate SiPM in one line and fibers in the other.
# FCAL
+
# FCAL: see link above to presentation for the collaboration meeting.
 
# Calibration and Monitoring (see link above).
 
# Calibration and Monitoring (see link above).
 
# Collaboration Meeting Preparations
 
# Collaboration Meeting Preparations

Revision as of 11:15, 5 May 2008

Connection

  • The meeting will be held at 10:30 am ET
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Reference Documents

  1. Previous minutes: April 21, 2008 Calorimetry
  2. Schedule, Tracker and Drawings (gluex pass)
  3. Schedule

Agenda

  1. BCAL Update
    • Report on the visit to Alberta (George/Zisis)
    • Fiber Specifications (Elton)
    • Fiber Testing (evaluation, production)
  2. FCAL Update [[1][FADC time resolution measurement]
  3. Calibration system update (Christina)
  4. Collaboration meeting On the schedule we have 1:15 min (what do we want to report? who?)
    • FCAL: a) results of light guide surface treatment, b) mechanical cell wall design c) timing measurements using the FADC
    • BCAL: a) Construction b) Readout/SiPMs, (Carl can give an update on JLab measurements)
    • Calibration:
    • Monte Carlo:
  5. Any other business

Minutes

Online: Elton, Beni, ELke, Christina, Matt. Mihajlo, John, Zisis, Andrei, George

  1. BCAL
    • Report on the visit to Alberta Media:UofAMeeting080429.pdf; increased role of Alberta; scheduling on the CNC machine
    • Fiber specs: Elton update the specs on the DocDB ([2]) with all comments he received. It can be sent on to procurement to prepare for a bid package. Regina findings in connection to the manufacturer's claim of fiber spectral response and no of photons produced per MeV were discussed. A NIM article is in preparation.
    • Fiber Testing: new parallel setup at JLab, absolute light output measurement, to accommodate SiPM in one line and fibers in the other.
  2. FCAL: see link above to presentation for the collaboration meeting.
  3. Calibration and Monitoring (see link above).
  4. Collaboration Meeting Preparations
    • FCAL
    • BCAL
    • Calibration
    • Monte Carlo
  5. Other business