Difference between revisions of "May 6, 2016 PID Upgrade"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 22: Line 22:
 
#* Laser access port design (Avetik/Maria)
 
#* Laser access port design (Avetik/Maria)
 
#* Photon loss due to the gap for the fiber [[https://gluexdirc.mit.edu/mirror-gap mirror gap]]
 
#* Photon loss due to the gap for the fiber [[https://gluexdirc.mit.edu/mirror-gap mirror gap]]
 +
#* [https://gluexdirc.mit.edu/mirror-reflectivity-versus-time Mirror Reflectivity ]
 +
# [https://gluexdirc.mit.edu/lookup-table-implementation Lookup Table Implementation]
 
# [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2996 Bar box shipping document] (John and Matt)
 
# [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2996 Bar box shipping document] (John and Matt)
 
# Support structure design update (IU)
 
# Support structure design update (IU)
 
# [[DIRC Planning for FY16|Planning for FY16]]
 
# [[DIRC Planning for FY16|Planning for FY16]]
 
# AOB
 
# AOB

Revision as of 19:13, 5 May 2016

Meeting Information

GlueX PID Upgrade Meeting
Friday, May 6, 2016
11 am, EDT
JLab room A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Collaboration Meeting
  3. Optical box design update (MIT):
  4. Lookup Table Implementation
  5. Bar box shipping document (John and Matt)
  6. Support structure design update (IU)
  7. Planning for FY16
  8. AOB