# Review of Action Items
 
# Review of Action Items
 
# Preliminary report from USM
 
# Preliminary report from USM
#* Updated schedule - Will B.
+
#* Updated schedule (Will)
#* Light collection - Will B.
+
#* Light collection (Will)
#* Prototyping planning - Sergey K.
+
#* Prototyping planning (Sergey)
 
#** R5505-70 17.5 mm, 26 mm OD vs. H6152-70 17.5 mm, 31 mm OD
 
#** R5505-70 17.5 mm, 26 mm OD vs. H6152-70 17.5 mm, 31 mm OD
#* KLOE energy resolution - Sergey K.
+
#** CNC modeling mill selection (see documents above)
 +
#* KLOE energy resolution (Sergey)
 
#** 1.64% vs. 2.4% KLOE b term (5.5% vs. 6.1% in the ‘a’ term)
 
#** 1.64% vs. 2.4% KLOE b term (5.5% vs. 6.1% in the ‘a’ term)
#* Summary of student activities on Hall D alternative readout project - Alam T.
+
#* Summary of student activities on Hall D alternative readout project - (Alam)
#* New lab spaces - Alam T.
+
#* New lab spaces (Alam)
 
#*  
 
#*  
 
# Review timeline
 
# Review timeline

Revision as of 09:12, 7 May 2009

Teleconference Time: 11:00 a.m. EST

  • EVO session
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 00406402# (remember the "#")

Items for followup from previous meeting

  1. Bcal section
    • Zisis will get a quote from Ross machining to find out how much it would cost to polish a segment (both ends)
    • Will will send a shipping address.
  2. JLab to determine how many fibers could be spared now to use in this project.
  3. Elton to determine availability of FM pmts (either from the project for loan) or for purchase from Hamamatsu
  4. Schedule: refinement of schedule by Will with input from Elton and others.

Documents to Review

Bcal signal shapes and sizes GlueX-doc-1244

Modeling CNC machine 1

Modeling CNC machine 2

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Preliminary report from USM
    • Updated schedule (Will)
    • Light collection (Will)
    • Prototyping planning (Sergey)
      • R5505-70 17.5 mm, 26 mm OD vs. H6152-70 17.5 mm, 31 mm OD
      • CNC modeling mill selection (see documents above)
    • KLOE energy resolution (Sergey)
      • 1.64% vs. 2.4% KLOE b term (5.5% vs. 6.1% in the ‘a’ term)
    • Summary of student activities on Hall D alternative readout project - (Alam)
    • New lab spaces (Alam)
  4. Review timeline
    • Materials for prototyping
  5. Bcal signals (Elton)
  6. MOU with USM

Minutes