Difference between revisions of "May 7, 2009 Readout"

From GlueXWiki
Jump to: navigation, search
(Documents to Review)
(Documents to Review)
Line 24: Line 24:
 
[http://www.jlab.org/Hall-D/software/wiki/images/b/b5/ING-09-0854_UTFSM_mdx-540_04-2009.pdf Modeling CNC machine 2]
 
[http://www.jlab.org/Hall-D/software/wiki/images/b/b5/ING-09-0854_UTFSM_mdx-540_04-2009.pdf Modeling CNC machine 2]
  
[http://www.jlab.org/Hall-D/software/wiki/images/4/40/FMreadout_schedule_v2.pdf Updated schedule for FM PMT design]
+
[http://www.jlab.org/Hall-D/software/wiki/images/4/40/FMreadout_schedule_v2.pdf Updated schedule for FM PMT design, from USM]
  
 
= Tentative Agenda =
 
= Tentative Agenda =

Revision as of 10:09, 7 May 2009

Teleconference Time: 11:00 a.m. EST

  • EVO session
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 00406402# (remember the "#")

Items for followup from previous meeting

  1. Bcal section
    • Zisis will get a quote from Ross machining to find out how much it would cost to polish a segment (both ends)
    • Will will send a shipping address.
  2. JLab to determine how many fibers could be spared now to use in this project.
  3. Elton to determine availability of FM pmts (either from the project for loan) or for purchase from Hamamatsu
  4. Schedule: refinement of schedule by Will with input from Elton and others.

Documents to Review

Bcal signal shapes and sizes GlueX-doc-1244

Modeling CNC machine 1

Modeling CNC machine 2

Updated schedule for FM PMT design, from USM

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Preliminary report from USM
    • Updated schedule (Will)
    • Light collection (Will)
    • Prototyping planning (Sergey)
      • R5505-70 17.5 mm, 26 mm OD vs. H6152-70 17.5 mm, 31 mm OD
      • CNC modeling mill selection (see documents linked above)
    • KLOE energy resolution (Sergey)
      • 1.64% vs. 2.4% KLOE 'b' term (5.5% vs. 6.1% in the ‘a’ term)
    • Summary of student activities on Hall D alternative readout project - (Alam)
    • New lab spaces (Alam)
  4. Review timeline
    • Materials for prototyping
  5. Bcal signals (Elton)
  6. MOU with USM

Minutes