Difference between revisions of "May 7, 2020 CPP Design Meeting"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 10: Line 10:
 
* Design/Fab/Install schedule [[Media:CPP_rough_schedule.pdf]]
 
* Design/Fab/Install schedule [[Media:CPP_rough_schedule.pdf]]
 
* 3D model - show progress
 
* 3D model - show progress
* Alignment tolerances
+
* Alignment tolerances require fine adjustment
** Relative to Beamline
+
 
*** Steel Absorbers, x,y,z
+
*** Lead Absorber, x,y,z
+
*** Detectors, x,y,z
+
** Relative to one another
+
** Repeatability
+
 
* Things to work out
 
* Things to work out
** Alignment tolerances
+
** Procurement/installation schedule
 +
** Alignment hardware
 
** Electronics shielding [[Media:Muon_Chamber_Shielding.pdf]]
 
** Electronics shielding [[Media:Muon_Chamber_Shielding.pdf]]
 
** Grounding [[Media:Muon_Chamber_dimensions.pdf]]
 
** Grounding [[Media:Muon_Chamber_dimensions.pdf]]

Revision as of 17:58, 6 May 2020

Meeting Time and Place =

Thursday May 7, 2020, 1:30pm Bluejeans https://bluejeans.com/710246635/3638?src=calendarLink

  • Present - Elton, Dave, Stephanie, Llya, Rory (remote)

Agenda

Minutes and Action Items

  • Reviewed minutes of last meeting
  • Need to notch steel at bottom to clear connectors -- Stephanie
  • Look at using a 90° connector -- Rory
  • Check gas line bending to clear beam left dark room -- Rory
  • Alignment requirements relative to BL - X&Y ±2mm, Z ±1cm
    • Met with survey - need to add x,y and z adjustments for the entire system to achieve this
  • Desire to have a small block of 5cm lead movable
    • can be a local adjustment
    • Ring with 7.5cm hole
    • ok to have 10cm thick where overlap is
    • Holes to be square with radius corner
    • Hole size should have 1mm precision
    • What should be the size of the hole in the large lead absorber?
  • Need to check repeatability of detector after moving FCAL platform
  • Develop a procurement plan for this FY -- Tim
  • Set up new meeting in 2 weeks