May 7, 2020 CPP Design Meeting

From GlueXWiki
Revision as of 09:20, 21 May 2020 by Whitey (Talk | contribs) (Minutes and Action Items)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Meeting Time and Place =

Thursday May 7, 2020, 1:30pm Bluejeans https://bluejeans.com/735541157/3638?src=calendarLink

  • Present - Elton, Dave, Stephanie, Llya, Rory (remote)

Agenda

Minutes and Action Items

  • Reviewed minutes of last meeting
  • Looked at possible installation schedules. The detector will be installed after spring 2021 run
  • Looked at gas line clearances - looks like bend radius is small enough so lines do not extend any further than the electronics panels on either side.
  • Need to design gas distribution manifold
  • Clearances cut in steel on 3D model look good
  • Need to review buckling loads on box tube (Tim)
  • Need to look at I-Beam reinforcement (Tim)
  • Set up new meeting in 2 weeks