Difference between revisions of "May 8,2020 Tech group meeting"
From GlueXWiki
(→Physics Resumption Planning) |
(→Physics Resumption Planning) |
||
Line 7: | Line 7: | ||
* Dependant on Governor Northam Covid-19 Phase in May 15 https://www.vdh.virginia.gov/coronavirus/ https://www.governor.virginia.gov/ [[Media:Va_metrics for reopening.pdf]] | * Dependant on Governor Northam Covid-19 Phase in May 15 https://www.vdh.virginia.gov/coronavirus/ https://www.governor.virginia.gov/ [[Media:Va_metrics for reopening.pdf]] | ||
* Jlab Update - [[Media:Rolf's_guidance.docx]] | * Jlab Update - [[Media:Rolf's_guidance.docx]] | ||
− | |||
* On Call Activity -- Tim nothing to report | * On Call Activity -- Tim nothing to report | ||
* Updates | * Updates | ||
Line 19: | Line 18: | ||
** Chris -- Welding, Training | ** Chris -- Welding, Training | ||
** Nick -- power supply temp/Flow readings | ** Nick -- power supply temp/Flow readings | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
** Fill out timesheets daily | ** Fill out timesheets daily | ||
* Anything else? | * Anything else? |
Revision as of 07:49, 8 May 2020
Meeting Time and Place
Friday May 8, 2020 at 9am Bluejeans https://bluejeans.com/835373169
Physics Resumption Planning
- Stuart's email
- Dependant on Governor Northam Covid-19 Phase in May 15 https://www.vdh.virginia.gov/coronavirus/ https://www.governor.virginia.gov/ Media:Va_metrics for reopening.pdf
- Jlab Update - Media:Rolf's_guidance.docx
- On Call Activity -- Tim nothing to report
- Updates
- Tim -- CPP Design, procurements and Analysis, GlueX Collaboration Meeting Prep https://halldweb.jlab.org/wiki/index.php/GlueX-Collaboration-May-2020, writing and Engineering systems Training, P&ID, Dibert and Leybold training
- Mark -- Return planning Media:Beam Resumption plan.docx, Log entries, Daily Virtual walktrough, training
- Scot -- SAD schedule, training, Gas system P&ID
- Josh -- welding, training tagger window replacement , ComCal Chiller P&ID etc....
- Stephanie -- CPP Redesign for alignment, CAD
- Keith -- Vacuum training, DIRC strongback procedure, replacement water filters and UV lamps
- Bobby -- DIRC Dark Box and Mirror Box Install CAD, 3D printing, P&ID
- Chris -- Welding, Training
- Nick -- power supply temp/Flow readings
- Fill out timesheets daily
- Anything else?