* Jlab Update - [[Media:Rolf's_guidance.docx]] | * Jlab Update - [[Media:Rolf's_guidance.docx]] | ||
* On Call Activity -- Tim nothing to report | * On Call Activity -- Tim nothing to report | ||
− | * | + | * Tasks |
− | ** Tim -- CPP Design, procurements and Analysis, GlueX Collaboration Meeting Prep https://halldweb.jlab.org/wiki/index.php/GlueX-Collaboration-May-2020, | + | ** Tim -- CPP Design, procurements and Analysis, GlueX Collaboration Meeting Prep https://halldweb.jlab.org/wiki/index.php/GlueX-Collaboration-May-2020, |
** Mark -- Return planning [[Media:Beam Resumption plan.docx]], Log entries, Daily Virtual walktrough, training | ** Mark -- Return planning [[Media:Beam Resumption plan.docx]], Log entries, Daily Virtual walktrough, training | ||
− | ** Scot -- SAD schedule, | + | *** Update return planning per Rolf's guidance |
+ | *** Assume only 3 techs per day working | ||
+ | *** Assume 1st day taking care of paperwork | ||
+ | *** Indicate any jobs that people need to be closer than 6 feet | ||
+ | ** Scot -- Continue SAD schedule, Put resumption plan into a Project schedule | ||
** Josh -- welding, training tagger window replacement , ComCal Chiller P&ID etc.... | ** Josh -- welding, training tagger window replacement , ComCal Chiller P&ID etc.... | ||
** Stephanie -- CPP Redesign for alignment, CAD | ** Stephanie -- CPP Redesign for alignment, CAD |
Revision as of 06:55, 8 May 2020
Meeting Time and Place
Friday May 8, 2020 at 9am Bluejeans https://bluejeans.com/835373169
Physics Resumption Planning
- Stuart's email
- Dependant on Governor Northam Covid-19 Phase in May 15 https://www.vdh.virginia.gov/coronavirus/ https://www.governor.virginia.gov/ Media:Va_metrics for reopening.pdf
- Jlab Update - Media:Rolf's_guidance.docx
- On Call Activity -- Tim nothing to report
- Tasks
- Tim -- CPP Design, procurements and Analysis, GlueX Collaboration Meeting Prep https://halldweb.jlab.org/wiki/index.php/GlueX-Collaboration-May-2020,
- Mark -- Return planning Media:Beam Resumption plan.docx, Log entries, Daily Virtual walktrough, training
- Update return planning per Rolf's guidance
- Assume only 3 techs per day working
- Assume 1st day taking care of paperwork
- Indicate any jobs that people need to be closer than 6 feet
- Scot -- Continue SAD schedule, Put resumption plan into a Project schedule
- Josh -- welding, training tagger window replacement , ComCal Chiller P&ID etc....
- Stephanie -- CPP Redesign for alignment, CAD
- Keith -- Vacuum training, DIRC strongback procedure, replacement water filters and UV lamps
- Bobby -- DIRC Dark Box and Mirror Box Install CAD, 3D printing, P&ID
- Chris -- Welding, Training
- Nick -- power supply temp/Flow readings
- Fill out timesheets daily