Difference between revisions of "May 8,2020 Tech group meeting"

From GlueXWiki
Jump to: navigation, search
(Physics Resumption Planning)
(Physics Resumption Planning)
Line 8: Line 8:
 
* Jlab Update -  [[Media:Rolf's_guidance.docx]]
 
* Jlab Update -  [[Media:Rolf's_guidance.docx]]
 
* On Call Activity -- Tim  nothing to report
 
* On Call Activity -- Tim  nothing to report
* Updates
+
* Tasks
** Tim -- CPP Design, procurements and Analysis, GlueX Collaboration Meeting Prep https://halldweb.jlab.org/wiki/index.php/GlueX-Collaboration-May-2020, writing and Engineering systems Training, P&ID, Dibert and Leybold training
+
** Tim -- CPP Design, procurements and Analysis, GlueX Collaboration Meeting Prep https://halldweb.jlab.org/wiki/index.php/GlueX-Collaboration-May-2020,  
 
** Mark -- Return planning [[Media:Beam Resumption plan.docx]], Log entries, Daily Virtual walktrough, training  
 
** Mark -- Return planning [[Media:Beam Resumption plan.docx]], Log entries, Daily Virtual walktrough, training  
** Scot -- SAD schedule, training,  Gas system P&ID
+
*** Update return planning per Rolf's guidance
 +
*** Assume only 3 techs per day working
 +
*** Assume 1st day taking care of paperwork
 +
*** Indicate any jobs that people need to be closer than 6 feet
 +
** Scot -- Continue SAD schedule, Put resumption plan into a Project schedule
 
** Josh -- welding, training tagger window replacement , ComCal Chiller P&ID etc....
 
** Josh -- welding, training tagger window replacement , ComCal Chiller P&ID etc....
 
** Stephanie --  CPP Redesign for alignment, CAD
 
** Stephanie --  CPP Redesign for alignment, CAD

Revision as of 07:55, 8 May 2020

Meeting Time and Place

Friday May 8, 2020 at 9am Bluejeans https://bluejeans.com/835373169

Physics Resumption Planning

    • Fill out timesheets daily
  • Anything else?