(Physics Resumption Planning)
(Physics Resumption Planning)
Line 16: Line 16:
 
*** Indicate any jobs that people need to be closer than 6 feet
 
*** Indicate any jobs that people need to be closer than 6 feet
 
*** Assume only 6-7 hours per day effective
 
*** Assume only 6-7 hours per day effective
** Scot -- Continue SAD schedule, Put resumption plan into a Project schedule
+
** Scot -- Put resumption plan into a Project schedule
** Josh -- welding, training tagger window replacement , ComCal Chiller P&ID etc....
+
** Josh -- Release BCAL cooling system resumtion procedure, tagger window replacement plans
 
** Stephanie --  CPP Redesign for alignment, CAD
 
** Stephanie --  CPP Redesign for alignment, CAD
 
** Keith -- Vacuum training, DIRC strongback procedure, replacement water filters and UV lamps
 
** Keith -- Vacuum training, DIRC strongback procedure, replacement water filters and UV lamps
** Bobby -- DIRC Dark Box and Mirror Box Install CAD, 3D printing, P&ID
+
** Bobby -- DIRC Dark Box and Mirror Box Install CAD,  
** Chris -- Welding, Training
+
** Chris -- Review documents, Training
 
** Nick -- power supply temp/Flow readings
 
** Nick -- power supply temp/Flow readings
  
 
** Fill out timesheets daily
 
** Fill out timesheets daily
 
* Anything else?
 
* Anything else?

Revision as of 08:02, 8 May 2020

Meeting Time and Place

Friday May 8, 2020 at 9am Bluejeans https://bluejeans.com/835373169

Physics Resumption Planning

    • Fill out timesheets daily
  • Anything else?