Difference between revisions of "May 8,2020 Tech group meeting"
From GlueXWiki
(→Physics Resumption Planning) |
(→Physics Resumption Planning) |
||
Line 16: | Line 16: | ||
*** Indicate any jobs that people need to be closer than 6 feet | *** Indicate any jobs that people need to be closer than 6 feet | ||
*** Assume only 6-7 hours per day effective | *** Assume only 6-7 hours per day effective | ||
− | ** Scot -- | + | ** Scot -- Put resumption plan into a Project schedule |
− | ** Josh -- | + | ** Josh -- Release BCAL cooling system resumtion procedure, tagger window replacement plans |
** Stephanie -- CPP Redesign for alignment, CAD | ** Stephanie -- CPP Redesign for alignment, CAD | ||
** Keith -- Vacuum training, DIRC strongback procedure, replacement water filters and UV lamps | ** Keith -- Vacuum training, DIRC strongback procedure, replacement water filters and UV lamps | ||
− | ** Bobby -- DIRC Dark Box and Mirror Box Install CAD, | + | ** Bobby -- DIRC Dark Box and Mirror Box Install CAD, |
− | ** Chris -- | + | ** Chris -- Review documents, Training |
** Nick -- power supply temp/Flow readings | ** Nick -- power supply temp/Flow readings | ||
** Fill out timesheets daily | ** Fill out timesheets daily | ||
* Anything else? | * Anything else? |
Revision as of 08:02, 8 May 2020
Meeting Time and Place
Friday May 8, 2020 at 9am Bluejeans https://bluejeans.com/835373169
Physics Resumption Planning
- Stuart's email
- Dependant on Governor Northam Covid-19 Phase in May 15 https://www.vdh.virginia.gov/coronavirus/ https://www.governor.virginia.gov/ Media:Va_metrics for reopening.pdf
- Jlab Update - Media:Rolf's_guidance.docx
- On Call Activity -- Tim nothing to report
- Tasks
- Tim -- CPP Design, procurements and Analysis, GlueX Collaboration Meeting Prep https://halldweb.jlab.org/wiki/index.php/GlueX-Collaboration-May-2020,
- Mark -- Return planning Media:Beam Resumption plan.docx, Log entries, Daily Virtual walktrough, training
- Update return planning per Rolf's guidance
- Assume only 3 techs per day working
- Assume 1st day taking care of paperwork
- Indicate any jobs that people need to be closer than 6 feet
- Assume only 6-7 hours per day effective
- Scot -- Put resumption plan into a Project schedule
- Josh -- Release BCAL cooling system resumtion procedure, tagger window replacement plans
- Stephanie -- CPP Redesign for alignment, CAD
- Keith -- Vacuum training, DIRC strongback procedure, replacement water filters and UV lamps
- Bobby -- DIRC Dark Box and Mirror Box Install CAD,
- Chris -- Review documents, Training
- Nick -- power supply temp/Flow readings
- Fill out timesheets daily
- Anything else?