== Physics Resumption Planning == | == Physics Resumption Planning == | ||
+ | * Stuart's email | ||
* Dependant on Governor Northam Covid-19 Phase in May 15 https://www.vdh.virginia.gov/coronavirus/ https://www.governor.virginia.gov/ [[Media:Va_metrics for reopening.pdf]] | * Dependant on Governor Northam Covid-19 Phase in May 15 https://www.vdh.virginia.gov/coronavirus/ https://www.governor.virginia.gov/ [[Media:Va_metrics for reopening.pdf]] | ||
* Jlab Update - [[Media:Rolf's_guidance.docx]] | * Jlab Update - [[Media:Rolf's_guidance.docx]] | ||
− | |||
* On Call Activity -- Tim nothing to report | * On Call Activity -- Tim nothing to report | ||
− | * | + | * Tasks |
− | ** Tim -- CPP Design, procurements and Analysis, GlueX Collaboration Meeting Prep https://halldweb.jlab.org/wiki/index.php/GlueX-Collaboration-May-2020, | + | ** Tim -- CPP Design, procurements and Analysis, GlueX Collaboration Meeting Prep https://halldweb.jlab.org/wiki/index.php/GlueX-Collaboration-May-2020, |
** Mark -- Return planning [[Media:Beam Resumption plan.docx]], Log entries, Daily Virtual walktrough, training | ** Mark -- Return planning [[Media:Beam Resumption plan.docx]], Log entries, Daily Virtual walktrough, training | ||
− | ** Scot -- | + | *** Update return planning per Rolf's guidance |
− | ** Josh -- | + | *** Add OSP signoff up front |
+ | *** Assume only 3 techs per day working | ||
+ | *** Assume 1st day taking care of paperwork | ||
+ | *** Indicate any jobs that people need to be closer than 6 feet | ||
+ | *** Assume only 6-7 hours per day effective | ||
+ | *** Ready for review Monday morning | ||
+ | ** Scot -- Put resumption plan into a Project schedule | ||
+ | ** Josh -- Release BCAL cooling system resumtion procedure, tagger window replacement plans | ||
** Stephanie -- CPP Redesign for alignment, CAD | ** Stephanie -- CPP Redesign for alignment, CAD | ||
** Keith -- Vacuum training, DIRC strongback procedure, replacement water filters and UV lamps | ** Keith -- Vacuum training, DIRC strongback procedure, replacement water filters and UV lamps | ||
− | ** Bobby -- DIRC Dark Box and Mirror Box Install CAD, | + | ** Bobby -- DIRC Dark Box and Mirror Box Install CAD, |
− | ** Chris -- | + | ** Chris -- Review documents, Training |
** Nick -- power supply temp/Flow readings | ** Nick -- power supply temp/Flow readings | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
** Fill out timesheets daily | ** Fill out timesheets daily | ||
* Anything else? | * Anything else? |
Latest revision as of 07:05, 8 May 2020
Meeting Time and Place
Friday May 8, 2020 at 9am Bluejeans https://bluejeans.com/835373169
Physics Resumption Planning
- Stuart's email
- Dependant on Governor Northam Covid-19 Phase in May 15 https://www.vdh.virginia.gov/coronavirus/ https://www.governor.virginia.gov/ Media:Va_metrics for reopening.pdf
- Jlab Update - Media:Rolf's_guidance.docx
- On Call Activity -- Tim nothing to report
- Tasks
- Tim -- CPP Design, procurements and Analysis, GlueX Collaboration Meeting Prep https://halldweb.jlab.org/wiki/index.php/GlueX-Collaboration-May-2020,
- Mark -- Return planning Media:Beam Resumption plan.docx, Log entries, Daily Virtual walktrough, training
- Update return planning per Rolf's guidance
- Add OSP signoff up front
- Assume only 3 techs per day working
- Assume 1st day taking care of paperwork
- Indicate any jobs that people need to be closer than 6 feet
- Assume only 6-7 hours per day effective
- Ready for review Monday morning
- Scot -- Put resumption plan into a Project schedule
- Josh -- Release BCAL cooling system resumtion procedure, tagger window replacement plans
- Stephanie -- CPP Redesign for alignment, CAD
- Keith -- Vacuum training, DIRC strongback procedure, replacement water filters and UV lamps
- Bobby -- DIRC Dark Box and Mirror Box Install CAD,
- Chris -- Review documents, Training
- Nick -- power supply temp/Flow readings
- Fill out timesheets daily
- Anything else?