(Created page with "November 16, 2017 Drift Chamber meeting = Connection = # [https://halldweb.jlab.org/wiki/index.php/Connect_to_Bluejeans_Meetings Instructions for Bluejeans meeting connectio...")
 
(Agenda)
 
(6 intermediate revisions by 2 users not shown)
Line 13: Line 13:
 
# Detector updates:
 
# Detector updates:
 
#* CDC update
 
#* CDC update
#** dE/dx (Nacer)
+
#** [https://halldweb.jlab.org/DocDB/0034/003476/003/nacer_gluex_20171116.pdf dE/dx] (Nacer)
 
#* FDC update
 
#* FDC update
 
# Tracking
 
# Tracking
 +
#* [https://halldweb.jlab.org/wiki-private/images/6/63/Sdobbs_Production_111517.pdf 2016 - 2017 comparison] Sean, Justin
 
# fADC125
 
# fADC125
 
# Other
 
# Other
Line 23: Line 24:
 
= Minutes =
 
= Minutes =
  
Participants: Mike, Naomi (CMU) Sean (FSU) Eugene, Alex A., Simon, Sergey, Alex B., and Lubomir (JLab).
+
Participants: Nacer (GSI), Curtis, Mike, Naomi (CMU) Eugene, Alex B., Alex A., Sergey, and Lubomir (JLab).
  
 
== Run preparations  ==
 
== Run preparations  ==
  
- Sergey: may be able to start cosmic run with CDC and FDC over the weekend.
+
- Nacer made presentation about dE/dx optimizing the pion/proton separation from rho photoproduction.  
  
- FDC threshold upgrade is done: all modules, cables installed; Hovanes finished the control system. Has to be tested, best with DAQ and software trigger looking at the noise.  
+
- FDC threshold upgrade is done: all mods, cables installed; Hovanes finished the control system. Has to be tested, best with DAQ and software trigger looking at the noise.  
 
   
 
   
 
- There WAS a problem with one FDC LV module - several channels didn't regulate the voltage. Module was replaced and now is OK.
 
- There WAS a problem with one FDC LV module - several channels didn't regulate the voltage. Module was replaced and now is OK.
Line 45: Line 46:
 
- Naomi still can't get the self-triggering working; P2 triggering is only working sporadically; suspects any and all of the modules in the VXS crate. In any case the target has been installed and most likely will not be possible to place iron source inside the CDC before the end of the run.
 
- Naomi still can't get the self-triggering working; P2 triggering is only working sporadically; suspects any and all of the modules in the VXS crate. In any case the target has been installed and most likely will not be possible to place iron source inside the CDC before the end of the run.
  
== Other ==
 
 
- TRD status: the entrance window of the TRD prototype has been replaced by a chromium one (much less material) by Brian Kross. The detector has been installed in the Hall, as well as a new VXS crate that will be used as an independent DAQ for the TRD tests.
 
 
- Nacer nearly missed the meeting (confusion with the summer saving time), wanted to present his dE/dx studies. He will do it next meeting (it two weeks).
 
  
 
-->
 
-->

Latest revision as of 12:54, 30 November 2017

November 16, 2017 Drift Chamber meeting

Connection

  1. Instructions for Bluejeans meeting connection
  2. Meeting ID: 290664653

Headline text

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/290664653.

Agenda

  1. Detector updates:
    • CDC update
    • FDC update
  2. Tracking
  3. fADC125