Difference between revisions of "Meeting 2022 04 18"

From GlueXWiki
Jump to: navigation, search
(Created page with "<span style="font-size:larger">'''Hall D SRC/CT Analysis Meetings: MONDAY 9:30am - 11:00am'''</span> Link to all previous meetings: [https://halldweb.jlab.org/wiki/index.php/...")
 
Line 7: Line 7:
  
 
=== Status of calibrations (all) ===
 
=== Status of calibrations (all) ===
* New monitoring pass: only 32% complete...slow on farm
+
* New monitoring pass: 44% as of Friday complete...slow on farm
 
* Summary from previous meetings: [https://docs.google.com/spreadsheets/d/1M-GC9mgXWc9hIjMNg9GZ-_KDFtPptTM2e1UlNDy47qU/edit?usp=sharing system status summary]
 
* Summary from previous meetings: [https://docs.google.com/spreadsheets/d/1M-GC9mgXWc9hIjMNg9GZ-_KDFtPptTM2e1UlNDy47qU/edit?usp=sharing system status summary]
 +
* (Sean) Generated all the support files/constants (e.g. random trigger
 +
background files) needed for generating simulations for the full
 +
SRC/CT run
  
 
=== Analysis topics ===
 
=== Analysis topics ===

Revision as of 09:27, 18 April 2022

Hall D SRC/CT Analysis Meetings: MONDAY 9:30am - 11:00am

Link to all previous meetings: Hall D SRC/CT Weekly Analysis Meetings

Please use halld_src mailing list for plots/communications!


Status of calibrations (all)

  • New monitoring pass: 44% as of Friday complete...slow on farm
  • Summary from previous meetings: system status summary
  • (Sean) Generated all the support files/constants (e.g. random trigger

background files) needed for generating simulations for the full SRC/CT run

Analysis topics

  • Analysis topics are listed here for discussion.
  • Rotating weekly update sign-up here

Analysis updates (all)